Railway development
Over the course of three years, nearly 10% of the MÁV buildings could be modernised
A framework agreement covering a massive modernisation programme has been signed by MÁV Pályaműködtetési Zrt. and NEO Property Services Zrt.. The company will be able to carry out refurbishments nationwide over a three-year period, the scale of which is well illustrated by the fact that
The project involves more than 201,000 m² of structural and masonry work, whilst the total building stock of MÁV (including subsidiaries such as Volánbusz) is estimated to be between 2.5 and 3 million square metres.
The purpose of their framework agreement is the renovation, conversion, maintenance and demolition of the buildings owned and managed by MÁV Zrt. and MÁV Pályaműködtetési Zrt., as well as the associated utility infrastructure. The task is to create buildings that meet modern requirements, using the technical and technological resources specified by MÁV Zrt. and ensuring high-quality design.
The function of the buildings is linked to railway operations; they are typically station passenger facilities, operational buildings, staff accommodation, warehouses and hall buildings, though there are also educational, cultural, medical, residential and other types of buildings amongst them. In some cases, this may involve the renovation and maintenance of buildings listed as historic monuments or under local protection, as well as the construction and renovation of roads, pavements and car parks associated with the buildings.
The call for proposals consists of three parts, with a total value of 23.4 billion forints. Of this, 5.5 billion forints net is allocated to Budapest, 14.9 billion forints net to Eastern Hungary, and 3 billion forints net to Western Hungary. MÁV has undertaken a drawdown commitment for the budget amount of 30%.
Source: B LinkB
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage