Industry news
Young titans of the construction industry honoured at this forum
The Young Engineers Forum, organised by Magyar Aszfaltipari Egyesülés (HAPA), was held for the sixteenth time in Budaörs. The event, which took place in the conference hall of Holiday Inn Hotel, featured fifteen professional presentations by engineers under the age of 35 on various topics related to the asphalt industry.
Fresh graduates, students and young professionals also targeted
According to the report sent to our newspaper, the event aims to provide a presentation opportunity for young engineers and professionals who have just graduated or have been graduating for a few years. Six prizes were awarded among the presenters, based on audience votes, typically providing the winners with a professional study trip or free participation in professional events abroad and at home.
"Every year, university students who are involved in some kind of scientific student work are invited to the forum," Tibor Veres, director of HAPA, told our newspaper. "We also invite recent graduates who have won a prize in the Ervin Nemesdy thesis competition, as well as young people under 35 working in our profession, whether in construction, research, public companies or raw material manufacturers."
The list of winners has been extended this year
The Director pointed out that this year's Forum was attended by a very diverse range of participants. Fifteen presentations were given, addressing the current issues facing the asphalt industry:
- environmental protection,
- digitalisation in paving,
- energy and material saving technologies.
According to Tibor Veres, this year the number of winners has been increased to six from the previous three: "In the past period, it has been noticed that there are also very interesting performances in addition to the three winners, so we have expanded the list of winners."
These young people won the top prizes
At the end of the event, the audience was able to cast their votes via an internet application. As a result, this year's first prize went to Duna Aszfalt Zrt. innovation chief engineer Szabolcs Rosta, won first prize with his presentation entitled „Development of high RA content asphalt mixtures at Duna Csoport”. The presentation dealt with the possibility of reusing crushed asphalt and increasing its quantity. „With his success, the engineer won free participation in the Eurasphalt & Eurobitume (E&E) Congress, which will be held in Budapest in June next year and will be attended by experts from all over the world,” added Tibor Veres.
The second prize went to Krisztián Szvoboda, laboratory manager at Colas Hungária Zrt. as a presentation entitled „Laboratory testing of the sound absorption capacity of asphalt mixtures”. „The presentation dealt with a very important environmental issue, which is of particular importance on urban road sections in order to increase the comfort of the population,” said Tibor Veres. The expert's prize is participation in a study trip abroad organised by HAPA in 2024.
The third step of the podium was a dead heat, so a split third place was declared. BarnabásŐri, a Colas Hungária Zrt. specialist, gave a presentation on "Supporting road rehabilitation construction using BIM methodology", which focused on the digital asphalt milling method and the special circumstances of the construction. Also finishing in third place were Rebeka Káli and Dávid Veres representing Széchenyi István University with their presentation entitled "Performance-based testing of bitumens used in Hungary". The third place winner won a free participation at the HAPA 2024 conference in February.
Today's leaders have proven themselves in the same forum before
Additional prizes were awarded to the 5th and 6th place winners, who will attend next year's HAPA conference at a reduced registration fee. Fifth and sixth place were both awarded to Duna Csoport professionals, with Anna Pék presenting a successful paper on "Construction of pavements with different skid resistance on the test track in Zalaegerszeg", and Tamás Horváth and András Bődy presenting a successful paper on "Application of 3D surveying technology in asphalt rehabilitation". The sixth place was a tie for third place, and Szigeti Diána, a Magyar Koncessziós Infrastruktúra Fejlesztő Zrt. specialist, also earned this place alongside Tamás Horváth and his team, who presented a paper on "The use of drones in road operations".
In closing, Tibor Veres said that the top three winners will also give their presentation at the HAPA conference, where they will be heard by a much wider professional audience.
"Based on the experience of previous years, the young people who are active in the Young Engineers Forum are at the forefront of their professional work, and the experience they have gained will greatly help them in their careers. It is no coincidence that many of the managers working in HAPA member companies are former Young Engineers Forum speakers."
- the Director pointed out.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
