What is being built?

Work is set to begin on the restoration of the façade of a building designed by a leading Baroque architect in Pápa

Published

Ádám Pintér / nyugat.hu, Google Maps
A contractor is being sought for phase II of the renovation of the Great Church in Pápa.

The Church of St Stephen the Martyr (Nagyteplom), with its 71-metre-high towers, rises above the town of Pápa. Bishop Károly Eszterházy, who commissioned one of the largest and most imposing Baroque/Copf-style buildings in the Transdanubia region, had it built by the leading architects of the time:

The twin-towered church was designed by Jakab Fellner, whilst its interior frescoes were painted by Franz Anton Maulbertsch

This place of worship, which belongs to the Archdiocese of Veszprém, was consecrated in 1795 and underwent renovation between 2023 and 2024. During this phase, structural work was carried out to ensure the building’s preservation and structural safety. These reinforcements made it possible to begin the external refurbishment of the main façade, the towers and the roof during the second phase of the reconstruction.

 

 

A complete external refurbishment is in store for the Great Church

A public procurement procedure has been announced by the Veszprémi Főegyházmegye for phase II of the external renovation of the Church of St Stephen the Martyr.

Applications to carry out the work can be submitted until 17 December 2026.

As part of the mandatory renovation works, the entire façade of the building will be refurbished, including the repair and painting of the plastered surfaces (totalling 3,294.24 m²), as well as the reconstruction of the spires and copper cladding. On the roof structure, the tiled roofing of the nave and chancel (1,520 m²) will be repaired, whilst the tin roofing of the gables between the side aisles and the towers (280 m²) will be completely replaced, with new eaves and gutters installed. In addition, 11 external openings (doors and tower windows) will be restored, including their stone frames and iron fittings. The project also includes the modernisation of the lightning protection and electrical systems, the installation of decorative lighting, and the carrying out of restoration work on stone, wood and metal elements, including the restoration of the statues, the tower clock and the gargoyle on the east tower.

The tender also includes an optional package. Should this option be exercised, work may include waterproofing the plinth, the installation of 16 new ornate copper roof vents, and the refurbishment or replacement of a further 29 windows with wooden ones. The optional works also cover the landscaping of the church grounds, comprising 443.24 m² of turfing, 81.46 m² of gravel surfacing and 172.72 m² of paving, as well as the restoration of the stone pillars and iron chains of the fence.

 

Source: Link

Popular