Industry news

Construction output stopped falling, with the indicator moving into positive territory in October

Published

KSH: construction output rose by 0.1% year-on-year and by 1.0% month-on-month.

In October 2023, the volume of construction output in raw data was 0.1% higher than a year earlier. Among the main construction groups, the output of building construction rose by 2.0 percent, while that of other construction fell by 2.6 percent, the Hungarian Central Statistical Office (KSH) reported on Friday.

Based on seasonally and working-day adjusted indices, construction output was 1.0% higher than in September.

 

Munnka on buildings and structures offset the performance of the specialised construction sector

Among the construction sectors, output was 14.1 percent higher in the construction of buildings and 2.9 percent higher in the construction of other structures. Production in the largest sector, specialised construction, fell by 8.9%.

The volume of new contracts signed decreased by 11.7%, with the volume of contracts for the construction of buildings down by 9.3% and that of contracts for the construction of other structures down by 13.9% compared to a year earlier. The volume of contracts in the construction sector at the end of October was 31.0% lower than in the same period of the previous year, with contracts for the construction of buildings down by 14.4% and contracts for other construction down by 42.5%. In the first ten months of the year, construction output fell by 4.2 percent compared to the same period of the previous year, the HCSO said.

Source : Link

Popular