Industry news
The Duna Pearl building disproves the prejudice that everything used to be better - VIDEO
Today's construction industry is often criticised for the fact that modern buildings do not come close to the sophistication and durability of older buildings. The Duna Pearl project, completed in the heart of Budapest, thoroughly refutes this prejudice, according to a statement by Mapei Kft..
A full-service centre completed on the Danube bank
The impressive residential and hotel complex built on the banks of the Danube in Budapest's 13th district comprises 193 apartments, a 109-room four-star Sheraton hotel, as well as cafés, shops and restaurants. The building complex, developed by POLAT Real Estate Hungary Kft., has a total floor area of approximately 40,000 square metres and was constructed using the most modern technologies and the highest quality materials. The designers and builders focused on quality and long-term durability in every detail.
The company has also put together a video showing the construction site from the outside and inside, featuring Csaba Nagy, Technical Director of KÉSZ Építő és Szerelő Zrt., and Szabolcs Tari, Sales Consultant at Mapei.
The buildings that stand the test of time are those that spare no time and resources
„To ensure durability, even in areas that are not visible, the most durable Mapei products were used for the coverings during construction, including all 193 flats, 2,000 square metres of terraces and the corridors. In addition, the professional contractors used Mapei products in a systematic manner, which provides the highest possible technical quality. Such meticulous attention to detail guarantees that a building will stand the test of time,” said Béla Markovich, managing director of Mapei Kft..
However, he says that it is a misconception that today's construction industry cannot produce buildings of the quality and durability of the past. In his opinion, today's architecture is just as outstanding as ever, as the Duna Pearl project is a prime example. Moreover, when it comes to sustainability, today's buildings are far superior to their predecessors, especially in terms of energy efficiency.
Green aspects were not ignored
The quality of the investment is well illustrated by the fact that the completed flats have an AA+ energy rating, meaning they have „minimal energy requirements”, which less than 0.5 per cent of certified buildings achieve. The condominium has been awarded a gold rating of LEED for its environmental performance, which is extremely rare for condominiums.
The multifunctional Duna Pearl property development is of significant importance in District XIII. As we reported earlier on the occasion of the topping-out ceremony, in addition to the general contractor KÉSZ Csoport, the foundation of the facility was laid by HBM Soletanche Bachy Kft. was responsible for the foundations of the facility, with Bayer Construct Zrt. also participated in the work as a subcontractor, and MEVA Zsalurendszerek Zrt. provided scaffolding to assist the specialists. The cladding work was carried out by Csiki Burkoló Kft..
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
