During the flood protection works near Vienna, the contractor used the MEVA Mammut 350 formwork system. This robust system played a key role in the safe construction of tall and complex structures...
During the construction of the Southern Circular Railway, the reinforced concrete piers with their special surface finishes are being built using MEVA’s custom-designed formwork systems.
MEVA provided the scaffolding supporting the multi-storey ice rink at the Csepel Ice Park.
MEVA formwork is used for new buildings at busy transport hubs.
The MEVA plastic formwork shell offers business advantages, long-term reliability and tangible environmental benefits, contributing to a more sustainable future for the construction industry.
In addition to the two main prizes, two special professional prizes and three special sponsorship prizes were awarded to the architects of the winning buildings at the 2025 House of the Year Awards ceremony...
The MEVA will continue to focus on customer proximity and product demonstrations in 2025.
The SZEnavis Betonkenu Team finished second in both the men's and women's divisions at the Krakow Concrete Canoe Challenge - with the MEVA also contributing to their excellent results.
MEVA Zrt.'s heavy-duty Mammut XT formwork system is being used in the NORDii Homes Sóstó Park project in Nyíregyháza, where precast reinforced concrete square elements are being used to build carbon-negative, sustainable homes.
With the lightweight MEVA system, 60 x 60 cm pillars can be installed in a grid spacing of up to 5 cm.