What is being built?

Quick construction without a tower crane? All you need is the right formwork

Published

Péter Építő Kft. / MEVA Zsalurendszerek Zrt.
With the lightweight MEVA system, 60 x 60 cm pillars can be installed in a grid spacing of up to 5 cm.

Roughly 7 percent of our capital's territory is under national or local nature protection. One of the largest of these areas is Lake Naples, with its surrounding forests and fields, which attracts Budapest's peace-seeking residents with its wild world. In an attempt to prevent the Szilas stream from flooding, in 1978 the stream was dammed and the Naplás lake was created, one of the most vibrant natural environments in Budapest with its extraordinary richness of wildlife.

Energy-conscious architectural solutions

The Furmint Houses III residential complex, which will reach the handover phase this autumn, is being built near the Lake Naples landscape reserve, in one of the largest green areas of the XVII district. The project is being carried out by MB Vincellér Kft., a member of the MB Real Estate Group and the residential property development division of Molnárbeton Kft.. The construction team aims to complete the third phase of 148 apartments before the end of the year.

The development of Molnárbeton Kft. features sustainable, energy-conscious architecture: the 18-24 apartment blocks will all use the Stiebel Eltron heat pump heating and cooling system, which uses renewable energy. The system is not only cost-effective and environmentally friendly, but also provides smart control via smart devices.

Construction without a tower crane

The structural work for the investment will be carried out by Péter Építő Kft. and Sankó-Ép Kft.. The former company requested the services of MEVA Zsalurendszerek Zrt. as a partner in the construction of special condominiums in order to assist in the creation of a building complex consisting of 18-24 flats with their products and expertise. Six houses are being built here in parallel, the size and layout of which did not allow for the installation of fixed tower cranes, so

"András Mészáros, the chief engineer of Péter Építő Kft., approached us with a request to recommend a universal, crane-independent formwork system that would allow him to build easily and efficiently," we learned from the experts at MEVA.

The MEVA lightweight, AluFix product family was recommended to contractors, specifically the AluFix pillar formwork element, which fits perfectly with the internal height of pillar-framed buildings. As they explained: „The AluFix family has enjoyed unbroken popularity among our partners since its launch, and at the beginning of the year it was expanded with the addition of the new manually operated 150-300 cm high AluFix column formwork elements with a height of 150-300 cm. These allow for the precise formwork of columns with a cross-section of up to 60 x 60 cm in a 5 cm grid.

The pillar elements can also be used as wall formwork elements thanks to the same interlocking points as the wall formwork elements."

It depends on the details

As a pillar element, the permissible fresh concrete pressure absorption capacity over the entire surface is 75 kN/m² and the well thought-out MEVA product design made the work of the formwork carpenters much easier, who were satisfied with the efficiency of the system. This is also due to a number of precisely engineered details such as

  • pre-drilled anchorage points for the pillar element, which facilitate accurate adjustment of the formwork on site;
  • special plastic plugs to help seal joints and anchorage points in the same material and plane;
  • high quality alcove plastic shutter with 7 years guarantee;
  • the easy-to-clean, high-quality powder-coated finish and the
  • fixing slipper, which secures the formwork against lifting.

The 12 sets of 300 cm high, adjustable manual pier formwork supplied to the contractors therefore significantly accelerated the speed of construction, as it made it independent of the capacity of the mobile lifting equipment.

Source : Link