Industry news

Top quality with Hungarian technology - here's a fence that won't need repainting for 20 years

Published

The automated plant in Nyíregyháza draws on decades of experience to manufacture the Everest Steel's timeless and aesthetically pleasing products for the residential market.

This is not the first time we have written about the Hungarian-owned Orha Group. Our summary, which also highlights the unique capabilities of the eponymous company – Orha Művek, which also highlights its unique capabilities, can be read here, whilst we have also recently reported on the company’s R&D activities reported. Now we’ll focus on a specific company and product range: we’re writing about the steel fences and fence panels marketed under the Everest Steel brand , which also belongs to the group.

The Everest Steel brand name was created in 2021 by the group to supply the entire Hungarian market, including the residential segment, with top quality steel products in line with its name.

All backed by decades of experience with the Orha Művek. Durable, high quality is coupled with outstandingly long rust resistance, whether for facade elements, load-bearing trapezoidal plates, or solar panel supports and even solar carports.

No rusting, no repainting

The Everest Steel fences are described in this year's Construma. Orha Művek provided our newspaper with information about the products manufactured in the Nyíregyháza production hall.

Although there are several C-profile fence elements on the market (the name refers to the shape), they are not completely sealed, and water, dust and snow can get stuck in them. The Orha Művek has developed a closed profile fence element that is protected from external influences, making it more durable.

The main design consideration was to provide a solution to the needs of the public, i.e. to create a product that is maintenance-free, without the need to sand and repaint every 2 years. This fence does not warp, does not fade, and once installed, it can be said to sit back. That's why a 20-year rust-through warranty is important.

Proprietary technology also gives you a price advantage

The Orha Group's proprietary technology developed for large-scale loads allows them to sell the high-quality product at a lower price. But the fence elements, which are mainly made for the residential market, are also suitable for industrial environments.

The durable, galvanised, polyester-coated, half-millimetre thick steel material is sourced directly from the manufacturers, but they can also produce it from painted aluminium sheet. The machining method involves rolling rather than edge bending to produce fully enclosed elements with millimetre precision, Orha Művek told us. They also offer complete clamping technology for the elements. The profiles are available in RAL colours and with a wood effect finish.

Source : Link

Popular