Bound track
Design of the road overpass in Ivánca can begin
The Építési és Közlekedési Minisztérium was published in the EU Public Procurement Bulletin. The work, worth a net value of HUF 56 million, will be carried out by Pannonway Kft..
As part of the programme for the development of industrial infrastructure in rural towns, comprehensive road and rail developments are planned in the town of Fejér County. This would involve expanding the industrial park in Iváncsa's rail connections to the Iváncsa industrial park, and comprehensive road developments could begin.
As we we wrote earlier, in connection with the development of the transport infrastructure of the Iváncsa industrial park, a separate-level crossing would be built on the 6205 connecting road passing through the town, over the Budapest-Pusztaszabolcs (40a) railway line. According to the plans, the largest span of the national road bridge will be 25 metres.
The successful tenderer will be responsible for preparing the preliminary study documents, the plans for the related hydraulic engineering, utility replacement and other construction and demolition works, and obtaining all necessary consents and permits for the construction.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
