What is being built?
Tótkomlós gains a modern venue for events with the modernisation of the community centre
A major renovation of the Tótkomlós cultural centre will be carried out, the municipality announced. The building has been given a more modern exterior and interior with 437 million forints from the Operational Programme for Spatial and Urban Development (TOP) Plus. The KÖVIÉP Építőipari Kft, the contractor for the works, is due to complete the project by mid-September 2024.
In the central institution of the town of Békés county with more than 5,000 inhabitants, the facade and the slab of the building will be insulated, the external windows will be replaced, the light bulbs will be replaced with energy-saving LED lighting, and the ventilation systems will be modernised. A heat-pump system and solar panels will be installed, and the building, which covers more than 2,000 square metres, will be made barrier-free as part of the project.
At the end of the renovation, the library on the ground floor of the building will also be renovated, and the auditorium will be ready for use again, allowing for city events, cultural programmes and events of local educational institutions.
The renewed cultural centre will also provide a new community space for the local Slovak community to preserve and nurture its tradition, language and cultural values, said Norbert Erdős (Fidesz), Member of Parliament for the region.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
