What is being built?
The renovated theatre of Debrecen, the Csokonai Teátrum, opened
The new season was launched with a grand gala at the renovated Csokonai Theatre in Debrecen. As a result of three years of work, a unique two-storey theatre with five theatres will be open to the public from autumn. The 150-year-old theatre was renovated with HUF 20 billion of funding, and has now three sections: prose and opera have been joined by dance.
Earlier, the reconstruction of the Csokonai Forum, known as the Latinovits theatre, was started, and this summer the Csokonai Theatre was completely renovated, with a change of management. Szabolcs Mátyássy, the new director of the theatre, said at a meeting of the company in early September that the two theatres can accommodate up to 1,100 spectators. He added that the reconstruction cost HUF 20 billion, which is unique in the country.
Our newspaper has previously reported on the renewal of Debrecen's emblematic building, inaugurated in 1865. The general contractor HUNÉP Zrt. practically demolished the building down to its structure, with the understage part going down to a depth of 6.5 metres. The work was carried out under the control of the Historic Monuments Authority, so conservation was important.
The Csokonai Theatre building was last renovated in 1983, but it was nowhere near the scale of the current renovation, which will take place between 2020 and 2023 under a contract from the Municipality of Debrecen. As a result, the theatre has been restored in its original style, with the exception of the arrival area.
As it was important to preserve the value of the new flooring, and to match the other limestone flooring in the building, Mapei ULTRATOP terrazzo was installed.
The uniquely patterned terrazzo flooring, plinth and buffet counter, as well as the self-supporting terazzo tile flooring of the external terrace from the buffet, were installed over a total area of 250 m2 with this flooring. In addition, the Mapei product was also used in the staircase. Another important requirement for the customer was that the coating should be easy to clean and maintain.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
