What is being built?

The knightly walls of Budavár may also be renewed

Published

Buda Castle's medieval appearance is most marked by the large, wide rounded rondella with its murder chariot and the square-shaped Sigismund Tower, which forms the eastern gate. Work on the rondelle is under way and the long-awaited renovation of the castle walls may now be possible.

The Confector Mérnök Iroda Kft. can carry out maintenance work on one of the 14th-century buildings in Buda Castle from a net budget of approximately HUF 1 billion carry out maintenance work on a part of Buda Castle built in the 14th century that has survived to this day. During the renovation of the castle wall surrounding the rondella closing off the castle from the south, in addition to wall reconstruction work, partial demolition and renovation work will also be carried out on the parapet.

Protecting the upper castle wall

The supporting pillars will be waterproofed and given new covers, but the recessed electrical track for the lights will also be renewed. There will also be the possibility to demolish the brickwork on the southern part of the upper masonry between the large rondelle and the south wall, and to install new capstones and cornice stones.

A number of works will also be carried out around the Great Rondella: in addition to the wall reconstruction works, the renovation of the castle wall around the gate tower will include the demolition and renovation of the entire parapet wall and the grouted sealing of the kazamata corridor, with the installation of new grilles and stone opening frames, as well as the construction of a staircase at the entrance to the corridor. In addition, the drainage system along the external walls will be modified to protect the masonry, including the installation of a sump shaft.

Paving the way for the New World Garden

In addition to the opening to the garden, the renovation and reconstruction of the lower wall between the great rondelle and the south wall will include the construction of a new parapet and capstones, and a new walkway on the inner side, where the water treatment system will be covered by individual water sprinklers, as well as the wall of the New World Garden, which will be renewed with individual water sprinklers and new light fixtures. Any archaeological demolition work required for the excavation work will be provided by the Client.

Source : Link

Popular