What is being built?
The Lake Fertő Ecocentre can be built without a hotel
The development of the Fertő Lake Eco Centre, which has been the subject of much debate, may resume. Work was halted a year ago, but now, based on the public procurement notice, the investment can continue, with reduced content as promised. The development, to be implemented in two parts, will be structured as follows:
- Part 1: To carry out the design and construction of the marina, boat and sailing marina, beach, sailing club, internal road and car park, as well as utilities, land and environmental planning and landscaping for the eco-park and leisure park.
- Part 2: Design and construction of the reception building and the Ecocentre.
The development elements to be built in the first part:
- Port zone (zone 1)
- Beach (zone 2), including beach entrance and changing rooms, refreshment facilities, seasonal changing rooms, water sports storage, and outdoor small wooden structures
- Sailing club area (zone 3)
- The elements that provide the communication (zone 4)
Dimensions of the first part, for areas classified as Natura 2000:
- area under environmental construction: 274.740 m2,
- and 115.245 m of low-impact environmental construction2.
- The net building area of the buildings to be constructed is 4.620 m2,
- while its floor area is 6.580 m net2.
In Part 2, the winner will be responsible for the implementation of the Reception Building and the Ecocentre, the basic parameters of which are:
- free-standing installation,
- installation rate: 1,7 %,
- green area coverage: 89,5 %,
- the Ecocentre's number of levels: basement, ground floor and one storey - building height: 7.17 metres.
- Total gross area of the Ecocentre: 3.215 m2
- Total capacity: 299 people
Structure of the EcoCentre:
- vertical load-bearing structure: on-site well pad, connecting girder grid;
- horizontal load-bearing structure: on-site reinforced concrete base plates, slab plates, on-site reinforced concrete load-bearing beams, on-site reinforced concrete attic beams;
- roof shape: 1.394 m2 extensive green roof, flat roof.
- It is also necessary to install an accessible passenger lift in the eco-centre building.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
