What is being built?

Győr's agglomeration municipality receives important improvements

Published

A previously missing community space will be built, while rainwater drainage and transport will also be improved in the project implemented by Strabag.

The foundation stone was laid in Écs, Győr-Moson-Sopron County, for the development of a local community space and park. The project, entitled „Development of Liveable Settlements in Écs”, will be implemented under Strabag Általános Építő Kft. at a cost of HUF 170.6 million, according to the article kisalfold.hu.

Dog run and playground at the new meeting point of the settlement

The investment is justified by the fact that the village near Győr has been lacking a community space and park that provides meeting and recreation opportunities. The investment will be made in the area behind the local grocery store, near the main road.

The most important part of the project is the creation of an event and community space with public lighting; and a grassed park with a variety of plants. The project will include 1,043 square metres of paved event space with drainage, 250 square metres of pavement and paved rest areas. In addition, a 214 square metre playground and a grassed dog run will be built.

The transport corridor through Pannonhalmaa will also be improved

At the project launch event, Mayor Norbert Szabó also reported that the intersection of Fő Street and the neighbouring Tó Street leading to Pannonhalma will be improved in connection with the above. The Tó utca-Fő utca intersection will be extended with a new pedestrian crossing crossing over Tó utca and the whole length of the pedestrian walkway next to Tó utca will be renovated. A bus stop on Tó Street will also be equipped with a bus shelter and a drop-off and pick-up platform.

The third and also very important part of the investment is the improvement of stormwater drainage. The entire stormwater drainage system will be upgraded next to the pedestrian walkway in Tó Street, and 200 metres of the already critical stormwater drainage system in Dózsa György Street will be renewed. The same length of the footpath alongside the ditch will be upgraded, continuing the section of footpath previously self-financed in front of the cemetery.

Source : Link

Popular