What is being built?

Major school extensions and renovations in Székesfehérvár and several towns in Fejér county

Published

New buildings, renovations - HUF 6.4 billion for vocational training institutions.

Recently, reported that a step change is expected in domestic vocational training as part of an EU-funded state development programme affecting 34 locations. Now, developments affecting Fejér County have been announced: six member institutions of the Székesfehérvár Vocational Training Centre will be renovated at a total cost of 6.4 billion forints.

At the event, held in the county seat, Balázs Hankó, Secretary of State of the Ministry of Culture and Innovation, stressed that 96 billion forints are available for the modernisation of vocational education and training. Of this, 53 billion forints will be used to build or renovate 110,000 square metres of buildings, the rest will be used to purchase equipment.

Deák Ferenc Technical School gets a new wing

Project manager Viktor Wetzl said that in Székesfehérvár

The Deák Ferenc Technical and Vocational School will have a new 1,500 square metre wing, which will house a canteen, a canteen, a canteen bakery, a hostel, a reception, a commercial classroom and a commercial IT classroom, with a budget of HUF 2.645 billion.

The ground floor of the Bugát Pál Technikum building will be renovated with 361 million HUF, which will be used to build a kindergarten, a nursery and a health classroom.

In the Széchenyi István Technical Technical College and the Váci Mihály Technical, Vocational and Vocational School, the energy modernisation of the mechanical workshops and the renovation of the interior of the workshops will be carried out with 290 and 227 million HUF, respectively, and a further 127 and 525 million HUF will be spent on the purchase of machinery.

 

The entire building of the Bicske Vocational Training Centre is renewed

<In Móron, the Perczel Mór Technical School, Vocational School and College is to receive 128 million forints to renew its mechanical equipment.

<In the case of the Vajda János Technical School in Bicske, the school building will be renewed inside and out with 562 million HUF, and a 30-year-old abandoned workshop will be completely reconstructed, while the reintroduction of the mechanical engineering department will also start. The necessary equipment will be purchased with 246 million forints.

In addition, all furniture will be replaced at all sites, at a cost of HUF 828 million. The project is scheduled to be completed by the end of March 2026.

Source : Link

Popular