What is being built?
Construction of new dormitory buildings could start in this university city
The University of Szeged Faculty of Medicine plans to expand the Miklós Jancsó Senior College in two phases, according to the EU public procurement announcement. Prior to construction, the contractor must demolish the two-storey buildings on the street front of Liliom Street and the single-storey buildings in the middle of the site.
Accessible rooms in the new dormitory
According to the call for tenders, the contractor will have to construct two new buildings with a total net floor area of 4806 square metres on the site bordered by Liliom and Semmelweis streets. The smaller dormitory on Liliom Street, with a useful floor area of 1 466 square metres, will have 30 double rooms, while the Semmelweis Street development will provide 180 beds. With a net floor area of 3340 square metres
- 1 single,
- 76 double rooms,
- 9 triple rooms will be available for students. In the latter, two of the rooms will be wheelchair-accessible, with four beds.
Housing for more than four thousand students after the extension
The development in Szeged also includes the improvement of the environment around the buildings. Plans include the construction of a 24-space car park. The investment will allow the University of Szeged to increase its current capacity of 3886 dormitories by another 240.
Source : Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
-
Bound track 2026. 10. 08.
Déli railway station is set to undergo a major refurbishment, paving the way for double-decker trains
