What is being built?
Renovation of a well-known market hall on Lake Balaton
The market hall in Balatonfüred will undergo environmental and architectural development, according to information published on TED. The description reveals that the work will be carried out as part of the second phase of the market hall's modernisation: the landscaping will be carried out by VEMÉV-SZERConstruction and Installation Industry Kft.VEMÉV-SZER Construction and Installation Industry Kft., while the architectural work will be carried out by KIVSZER Építőipari Kivitelező és Szervező Kft..
In the course of the environmental rehabilitation, the existing market hall will be demolished, including the asphalt pavement and the paving stones. At the same time, the project will include the construction of a drainage shaft and a storm drain, as well as the construction of a new paving and asphalting works by VEMÉV-SZER.
The architectural modernisation to be carried out by KIVSZER includes a complete architectural, mechanical and electrical renovation of the bathroom block. In addition, the polycarbonate dongle surface of the roof will be renovated. In addition, the outdoor air conditioning unit will be covered and the new outdoor waste compactor will be covered.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
