What is being built?

New warehouses are being built in several locations in the metropolitan agglomeration

Published

Illustration (Raktárad - Hall Centre/Facebook)
RaktárAD, with a Belgian-Hungarian ownership background, builds logistics facilities tailored to the needs of Hungarian SMEs.

This year, the real estate developer RaktárAD has launched the construction of 12 200 m² of logistics real estate (four in Alsónémedi and one in Vecsés) in a unique real estate market scheme without any prior order. Two warehouse centres in Vecsés have already been completed, while the construction of the three others is going on in parallel, according to a press release sent to this newspaper.

Technical parameters and sustainable solutions for halls

The buildings RaktárAD are made of PIR panels with a heat transfer coefficient meeting the requirements for a heated hall (roof panel U < 0.170 W/m²K, side panel U < 0.230 W/m²K) and the halls are equipped with 2 air chambers plastic windows.

More than 100 saplings and shrubs have been planted in the facilities' parks so far, and by spring 2025, 1,000 more will be planted to support carbon sequestration. Careful attention has also been paid to waste management during construction.

More than a hundred professionals have worked on the projects so far, including the construction of the utility system and the connecting infrastructure, the company said in a statement.

In the next two years, new developments will be carried out on an additional 5 hectares in Vecsé and 3 hectares in Alsónémed

This is how the RaktárAD system works

The Belgian-Hungarian company has so far delivered more than 130,000 m² of warehouses, which has significantly contributed to the efficient operation of domestic SMEs. The new generation buildings offer opportunities especially to businesses that have been operating in smaller, outdated locations or residential areas.

The companies moving in represent a diverse range of industries. They include a car parts wholesaler, a motorcycle repairer, a food manufacturer, a single tool manufacturer and a heating equipment installer, as well as logistics centres for web shops.

By joining forces and designing their energy system with the help of professionals, businesses can significantly reduce their energy costs. And they can re-invest the resources freed up in business development, boosting competitiveness and sustainable growth." - said Zita Karvaly, CEO of Goodwill Energy Zrt., presenting one of the benefits of the scheme.

The halls can be customised to meet specific technical requirements

The location of the RaktárAD complexes, both at Liszt Ferenc Airport and in close proximity to Budapest, provides ideal infrastructure for business purposes, especially for intermodal transport.

The companies moving in represent a diverse range of industries. They include a car parts wholesaler, a motorcycle repairer, a food manufacturer, a single tool manufacturer and a heating equipment installer, as well as logistics centres for web shops.

The Weerts Logistics Park (WLP) already has over 1 000 000 m2 of high-tech logistics investments in Belgium, the Netherlands, France, Germany, the UK and Italy. Over the last 6 years, it has built more than 200 000 m2 in Hungary, directly created more than 1 000 jobs and indirectly nearly 4 000 jobs and has hosted more than 150 domestic companies.

Source : Link

Popular