What is being built?
Closeness to nature and harmony - The Hungarian Pavilion of the Osaka World Expo unveiled
The 2025 Osaka World Expo opens in April, with Hungary as one of the 160 countries represented with a national pavilion. Today, the architectural, creative and artistic concept of the Hungarian Pavilion, which builds on Japanese-Hungarian cultural parallels and focuses on music as a universal language that bridges cultures, was presented in Budapest.
At the presentation, Minister of National Economy Márton Nagy stressed that "The World Expo is one of the world's most important cultural, tourism and economic events, so Hungary's presence at the World Expo is in the national economic interest. The East Asian region is one of the most dynamic tourist destinations for our country. Japan serves as the gateway to the region, so a successful Hungarian participation in Osaka could significantly boost inbound tourism from there.
Preserving cultural traditions is the answer to global challenges
The concept of the Hungarian Pavilion sees the solution to global challenges in the preservation of values that span generations, and therefore emphasises the importance of coexistence with nature and our heritage.
The Pavilion's experiential approach helps people to understand that preserving cultural roots is a priority for a sustainable future," said Dávid Drozsnyik, the expert responsible for the creative concept of the Hungarian Pavilion.
The unity of building, landscape and peasant culture
The pavilion offers a close-to-nature experience, with visitors entering a green environment reminiscent of Hungarian meadows. Here, the common points of Hungarian and Japanese culture come to life. Gábor Zoboki, Kossuth and Ybl Prize-winning architect and the architectural conceptualiser of the pavilion, said:
"The architectural concept was inspired by the building style and settlement pattern found in both Japanese and Hungarian folk architecture, as well as the building materials provided by nature. The building proclaims the unity of landscape and peasant culture, as our folk music and folk dance culture is a mirror of the Hungarian soul."
He added: "In the lobby of the building, we evoke the flora of the gentle meadows of the Carpathian Basin. Visitors arrive through a forest clearing, the calming area recalls the natural images and their sound world of "Bolyongó", the opening lines of folk songs - while in the "Zengő Dóm" (Swinging Dome) we can learn a characteristic Hungarian pentatonic folk song.
A theatre space in the Duomo
The central part of the pavilion is the Dome, which houses the theatre space and has an elemental effect, resembling a boglya from the outside. "In creating the main attraction of the Hungarian Pavilion, our aim is to create an everlasting experience in which the audience arrives at an infinite, universal space through a world inspired by the Hungarian landscape. The absolute centre of this space is the Hungarian folk song", explained Bence Vági Harangozó Gyula Harangozó Prize-winning director, choreographer and creator of the artistic concept of the Hungarian Pavilion.
"The audience does not just listen to a Hungarian folk song, but gradually becomes part of it in an ever-changing environment, and then, humming the melody, can take a piece of Hungarian culture with them" - said the artist, explaining the power of the special, live folk music production that has an emotional impact.
Showing common values without words
The main goal was to discover the common values and roots found in the pentatonic-based melodies of Japanese and Hungarian folk music, which provide a unique sound. "The exhibition offers visitors an immersive experience through the universal language of music, rather than the traditional information-based approach," said creative specialist László Ördögh.
Three levels to serve both business and visitor needs
In addition to the reception and exhibition area, the three-storey pavilion will also house a visitor gift shop, restaurant and wine bar, as well as a community space for business meetings. The Pavilion's dishes are based on the ingredients of the Hungarian country court, peasant culture and national traditions.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

