What is being built?
Ten-year long-awaited swimming pool construction completed in Tolna county seat
The Sipos Márton Sportuszoda in Szekszárd, built with the support of the Modern Cities programme, was inaugurated. The semi-finished municipal swimming pool was completed by a consortium of VEMÉV-SZER Kft. and LATEREX Építő Zrt.. The ceremony was attended by Prime Minister Viktor Orbán and Minister of Construction and Transport János Lázár.
As we mentioned earlier, the redevelopment work that began again last May was necessary because the town's swimming pool, built in the 1970s, was closed in 2015 for structural reasons. Since then, the 34,000 residents of the town have been using a temporary covered pool.
The geothermally heated building is also suitable for polo matches and short-course swimming competitions
The Sport Street facility was built next to the city's leisure pool and sports hall, which opened in 2012. The swimming pool has a built-up area of 2,458 square metres and includes a 25 x 33-metre swimming pool and an 8 x 16-metre teaching pool. In the former, a water polo field and swimming lanes can be designated.
Toilets, changing rooms and a pool lift were built for the disabled. The swimming pool has a 250-seat grandstand, a sports sauna, a relaxation area and a plunge pool. The building is heated by geothermal energy.
The swimming pool is named after the former world record holder
At the inauguration ceremony on Thursday, Mr Orbán recalled that the namesake of the sports centre, Márton Sipos, born in Szekszárd, held the world record in the 100-metre breaststroke in 1922. He stressed that Tuesday was not only the inauguration of a swimming pool, but also of a space for a community. Sport really builds community, and what every town and village in Hungary needs most today is for people to meet each other, talk to each other, understand each other, do something together, and sport is an excellent opportunity to do this here in Szekszárd, too, he pointed out.
He stressed that in the Modern Cities programme, 22 billion forints worth of investments have been made in Szekszárd: 8 billion for a knowledge centre, 3 billion for utilities development, 7.5 billion for a swimming pool and 3.5 billion for an industrial park. The government supported 37 enterprises in Tolna County through the Demján Sándor Programme, worth HUF 2.5 billion, while HUF 22 billion was allocated to the county through the Baross Gábor Re-industrialisation Loan Programme. There are currently 11 development programmes worth some HUF 5 billion, and 270 projects, investments and developments are underway in the district with HUF 20 billion in aid.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
