What is being built?
Major industrial development in Dunavecce - new concrete element production plant to be built
The MZ Precast Kft. – a member of the MERKBAU group, laid the foundation stone for its new concrete element manufacturing plant in Dunavecse, Bács-Kiskun County, on 10 October, in a ceremony that marked one of the most significant industrial investments in the region in the coming years. The plant is expected to start operating in 2026 and, in addition to serving the industry with the prefabrication of concrete elements, it will also create numerous jobs in Dunavecse, the investor informed our newspaper.
The project is supported by the Government of Hungary and Nemzeti Befektetési Ügynökség (HIPA), while MZ Precast Kft. is a joint venture between MERKBAU Zrt. and KMZ Group, based in Serbia.
The market is turning to precast reinforced concrete structures
The project was necessary because due to the significant increase in the market demand for precast reinforced concrete structures, there have been several occasions when precast structures could not be obtained in time on the Hungarian market. The development will result in a concrete production capacity of 25,000 m3/year, which can be increased up to 50,000 m3/year in the future.
Speakers at the groundbreaking ceremony included József Knáb, Chairman of the MERKBAU Zrt. Board, MP of Parliament Sándor Font and Minister of Foreign Affairs and Trade Péter Szijjártó. Antonio Zanetti, owner of the KMZ Group also contributed to the symbolic event and closed the event with a standing reception.
Taking into account market expectations
In his speech, the Chairman of the MERKBAU Zrt. Board of Directors first outlined how the project went from idea to start of construction. "Due to industrial investments and the significant increase in the market demand for precast reinforced concrete structures, we were unable to obtain precast structures on time on the Hungarian market for several of our projects", said József Knáb, describing the market situation that led to the investment.
He recalled the establishment of contact with Antonio Zanetti, explaining that the leader operates Serbia's largest prefabrication plant with the highest capacity in the neighbourhood of Belgrade. "Cooperation on successful projects has established the trust that has allowed the preparation of the establishment of a joint venture, MZ Precast Kft.", he concluded.
Efficient operation, powered by solar energy
He said that Dunaveche was selected from ten possible sites, with logistics being a key factor in the choice. These factors are expected to improve even further following the construction of the planned M8 and M200 motorways, he added, and thanked Mayor Sándor Vörös for his support, promising a positive partnership with the municipality.
He said that they are building a factory that will produce efficiently even in a tight market, and that green solutions have been an important aspect in the design of the plant, so the new plant will not use natural gas and will source the vast majority of its energy needs from solar energy.
Grant contract signed after six months of intensive negotiations
"As the planning progressed, we also realised that our enthusiasm, our great location, our excellent ideas and plans were in vain: without support, we would not be able to realise our plans. At this point, we approached Sándor Font, MEP, who we would like to thank for his openness and support, and with whom we knocked on HIPA's door a good year ago to outline our plans," he said.
To summarise:
After one and a half years of intensive preparatory work, the grant agreement was signed and mutual commitments were made, the most important of which are that MZ Precast will create a significant number of jobs in Dunavecsé and that the Government of Hungary, through HIPA, will provide a significant non-refundable financial contribution to the investment. József Knáb thanked the Minister present and the CEO of HIPA for their support.
Lower sectoral production is not a concern for the company
He also stressed that the fact that construction volumes have been lower in recent years is not a concern for either MERKBAU or their Serbian partner. He pointed out that Merkbau had also invested in 2008-2010, and that this had worked then too, during the boom period.
The President of the Board concluded his speech with a reflection by the Benedictine monk Anselm Grün: "God's blessing does not mean that everything goes smoothly, but that we are not alone on the path."
The most effective solutions
Minister of Foreign Affairs and Trade Péter Szijjártó said on the spot:
The factory, which will create 65 new jobs in the first phase, will use the most modern production management system and the most efficient architectural solutions available, and also highlighted that the facility will be almost entirely solar-powered.
He also pointed out that unemployment in Bács-Kiskun county has halved over the past ten years, while industrial production has more than doubled, from HUF 1,800 billion to HUF 3,800 billion a year.
Péter Szijjártó described the last fifteen years as the re-industrialisation of Hungary, during which the foundations of a strong economy were laid, creating the most investment-friendly environment in Europe, including the lowest taxes on the continent.
Nearly 15 thousand square metres of complex to be built
The main function of the planned 14 930.99 m² facility will be the production of concrete products, using modern technology and efficient processes. In addition to the main production hall, the plant will house offices, a porter's lodge, a warehouse, a concrete mixing plant, silos and outdoor hazardous material storage.
The hall construction elements (such as cup necks, plinth elements, pillars, beams) and the wall and slab elements, which are stored in an open area, will be produced in the covered and closed production plant.
Minimal waste is generated only during production
The production of the elements will involve not only live labour but also mechanised and partly automated technology. Thanks to a precise preparation and design phase, the process will generate minimal concrete and reinforcing steel waste.
In addition to the construction of the plant hall and infrastructure, the technological procurement also includes the concrete mixing plant, concrete mixers, trucks, bridge blocks, moulds, formwork elements, tensioning tracks and cages. A modern production management system based on the principles of Industry 4.0 will be introduced to automate processes.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Current at 2026. 09. 30.
It’s being built at full speed and could be the saviour of our domestic energy security – what is it?
