What is being built?

Nearly one billion forints invested in the Csongrád spa

Published

csongradfurdo.hu
The geothermal system in Csongrád is being renewed: a new well is being drilled in the spa area to provide the missing thermal energy. The project will be completed by August 2027.

With EU support and an investment of approximately 974 million forints, the energy system of the Csongrád Spa and Swimming Pool will be modernised, a new thermal well will be drilled, and a state-of-the-art building management system will be installed, according to information provided by the local government of the town of Csongrád-Csanád.

According to the announcement, the comprehensive investment project, which will be completed by August 2027, aims to reduce carbon dioxide emissions from municipal properties, making the library, medical clinic, school canteen, warming kitchen and municipal spa more sustainable.

They are drilling a well 1.8 kilometres deep.

The end point of the geothermal cascade system in Csongrád is the spa, but due to the heat demand of connected consumers and the deterioration of the well's production capacity, gas heating must also be used in the institution at present. The new well, drilled in the spa area to a depth of 1,800 metres, will provide the missing thermal energy capacity, while the extracted water, at a temperature of 60-65 degrees Celsius, will also be used for balneological purposes.

The development also includes the energy modernisation of the spa's therapeutic pools: the pumps will be inspected, refurbished and, if necessary, replaced. Significant energy savings can also be achieved by installing a modern building management system, upgrading the fans and optimising the compressors and blowers.

Source: Link

Popular