An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward
Class HE-DO brought the summer to a close with a family sports day
Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage
The revamped Zsóry Spa may take on a Matyó character
Beyond the noise barriers: the Leier and Durisol offer a sustainable alternative in building construction too
Rerouted lines – a major upgrade is set to begin on the trolleybus network linking the city centre with Népliget
Development work worth over two billion forints is being prepared at two educational institutions in Kaposvár
Everyone needs a bit of exercise! The Fitt park pump track in Barcs was built using hand-formed curves
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
A major US investment is boosting energy investment in Romania
Kaposvár’s ‘sponge city’ development could serve as a national model programme
New car parks with permeable surfacing are being built in Zugló – rainwater will be retained on site
It is not an empty building that is energy-efficient, but one that is managed intelligently
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
Drilling is also taking place beneath the railway: work on the Déli Körvasút project continues with the relocation of utility lines
Many people have been waiting for this: Zugló railway station is set to undergo a comprehensive refurbishment as part of accessibility improvements
Experts are working on a 28-kilometre section of the Miskolc–Hidasnémeti vasútvonalon
The SWIETELSKY Vasúttechnika Kft. has been declared the winner in two railway development projects
The AKKO Invest may be expanded to include a designer of airport hotels
The KBM call for entries is aimed at the cream of the crop of Hungarian architecture
A new co-CEO has joined KÉSZ Csoporth
The Sándor Wekerle Housing Construction Programme – up to two billion euros could boost the Hungarian housing construction market
The Duna Aszfalt redeems the bonds issued under the GED Africa project
They will continue to work in the Cegléd, Pilis and Albertirsa areas.