Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The government wants 10-year development cycles for the construction sector

    • Young skilled workers can set off on their apprenticeship placements today as well

    • It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about

    • „The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

    • Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!

  • Paks II
  • MKIF
  • What is being built?
    • Work is set to begin on the restoration of the façade of a building designed by a leading Baroque architect in Pápa

    • The construction programme for a passive-energy block of flats in Angyalföld is continuing, with 58 flats being built on this corner plot

    • Demolition work is in full swing on the side of the M1 motorway heading towards Győr

    • A college of circus arts is being built in Pesterzsébet

    • Gádoros community centre is being modernised through a complete refurbishment

  • Climate-X
    • This is a first: green energy is being generated from a depleted hydrocarbon well in Kiskunhalas

    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

  • Bound track
    • Preparations for the refurbishment of the main railway line in Pécs are set to begin

    • Plans are already underway for the next phase of the Buda interlinking line, extending it as far as Albertfalva

    • A new public procurement process is being prepared to continue the second phase of the Déli körvasút

    • The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

  • Industry news
    • An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

    • Are you a marketer? Make yourself visible!

    • We do need a pump after all! – How does the BIM pay for itself in industrial investments?

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

  • Magyar Építők

Andocs

  • What is being built?2 years ago

    Over a century-old former tailor's shop to be converted into a community centre at the famous pilgrimage site

    A new community and cultural centre could be built in Andocs, one of the oldest shrines in Hungary, in the Somogy county. Currently, the former sewing shop is the venue for cultural events.

More Posts
  • Latest
  • Popular
Road building2026. 11. 18.

A new binder and wearing course is to be laid on a 1.3-kilometre stretch of Road 67

Bound track2026. 11. 18.

Preparations for the refurbishment of the main railway line in Pécs are set to begin

Road building2026. 11. 18.

The renovation of Hajnóczy Street in Szeged is focusing on climate-adaptive and sustainable solutions

Road building2026. 11. 18.

A section of a street spanning two districts is to be renovated in Budapest

Railway development2026. 10. 23.

The Buda interchange could also be extended northwards

What is being built?2026. 10. 21.

We took a look at how the refurbished Igazságügyi palota building turned out

What is being built?2026. 10. 21.

An arena powered exclusively by green energy is set to be built in Romania: construction of the stadium is already underway

What is being built?2026. 10. 20.

Reconstruction of the M1 motorway’s carriageway towards Győr can begin under the new traffic arrangements

Advertisement

Building Connections

Building Connections provides a clear, professional overview of the construction industry in Europe, Central Europe and the Balkans. Exclusive information and accurate content.

Follow us

Latest

  • Road building2026. 11. 18.A new binder and wearing course is to be laid on a 1.3-kilometre stretch of Road 67
  • Bound track2026. 11. 18.Preparations for the refurbishment of the main railway line in Pécs are set to begin
  • Road building2026. 11. 18.The renovation of Hajnóczy Street in Szeged is focusing on climate-adaptive and sustainable solutions

Selection

  • Road building2026. 09. 24.The curse is lifted: the sections of the Bihor motorway, which have been under construction for 22 years, could be handed over as early as December
  • Bound track2026. 10. 31.From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project
  • Climate-X2026. 11. 08.Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

© 2026 Building Connections - BC Zrt. - 18 November 2026.

  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Cookie Policy
  • Tokajland
  • BC COMM