Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The first to arrive for the expansion of the Paks Nuclear Power Plant was a 350-tonne tower crane

    • It showcases not just products, but a complete garden – the Leier show garden in Győr takes landscaping to a whole new level

    • Marketing, Trust and Talent in the Construction Industry – Key Takeaways from the Construction Industry Marketing Communications Conference

    • MEVA technology has been used to reinforce flood defences in Vienna

    • The MERKBAU proves its worth in a city centre project – Graduation ceremony at the capital’s student accommodation

  • Paks II
  • MKIF
  • What is being built?
    • The modern poultry processing plant in Szentes is being built at record speed

    • The castle’s role in education in Verpelét may come to an end: the school building is being renovated

    • Research and teaching capacity has quadrupled thanks to the development of Semmelweis University

    • This is how the new Porsche Hungaria logistics hall is rising from the ground in Budaörs

    • The dismantling of Körszálló continues with the use of spectacular heavy machinery

  • Climate-X
    • The renovation of the Balaton water control gate has been recognised with a professional award

    • This is how the construction industry can go green – here’s a leading example from Hungary

    • A solar power plant and energy storage facility in Baracska will boost the supply of renewable energy

    • Research conducted by the University of Szeged has attracted international attention and could provide a new basis for water replenishment planning

    • Plans can be drawn up for a new canal linking the Körös rivers

  • Bound track
    • A new chapter in the Hungarian bridge-building industry – we explored the most exciting sections of the Southern Circular Railway

    • Work on the embankment is already underway, and trains will soon be running again on the revitalised Transdanubian railway line

    • The modernisation of the Debrecen–Mátészalka railway line has entered the planning phase

    • Szeged railway station and its surroundings could benefit from a comprehensive transport development project

    • Planning can begin – the M2 line could be extended to Cinkota, and the HÉV lines could be upgraded

  • Industry news
    • The young people have spoken: there is no rejection of the construction industry!

    • The Cemix Color Compass online application adds a new dimension to the selection of façade colours

    • A bronze plaque marking the Quality Award for the refurbished stations on the M3 metro line has been unveiled at Kálvin Square

    • An innovative guide to help you choose façade colours: the Cemix Color Compass is here

    • The new division of ÉVOSZ has made fair market competition and feasible plans its guiding principles

  • Magyar Építők

Debrecen–Mátészalka railway line

  • Bound track2 days ago

    The modernisation of the Debrecen–Mátészalka railway line has entered the planning phase

    Preparations for a comprehensive railway development project can now begin on the section of railway line No. 110 between Debrecen, Apafa and Mátészalka. The design work involves, among other things, the modernisation of approximately 70 kilometres of single-track railway line.

More Posts
  • Latest
  • Popular
Road building2026. 05. 06.

A new national road is being built near Iváncsa

Climate-X2026. 05. 06.

The renovation of the Balaton water control gate has been recognised with a professional award

What is being built?2026. 05. 06.

The modern poultry processing plant in Szentes is being built at record speed

Road building2026. 05. 06.

Roadworks in the Tamási area were completed months ahead of schedule

Road building2026. 04. 07.

Innovation on the motorway: digital models, drones and future-proof solutions in operations

What is being built?2026. 04. 07.

Budapest’s Citadel has opened – Renovation of the Citadel is complete

Industry news2026. 04. 07.

The biggest problems with paving stones have been resolved

What is being built?2026. 04. 07.

The Galerius in Siófok has reopened as a year-round water park

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt.