The planned development of the 100-hectare site will include 35-40 hectares of parkland and public space.
The call for tenders MÁV has been received: according to the previous condition assessment, the brownfield site is expected to be excavated and disposed of as hazardous waste with a volume of nearly 250 thousand cubic metres of contaminated soil.
ÉKM aims to complete the clearance of the brownfield site by the summer. Around 600-650 thousand square metres of office, residential and commercial buildings would be built; a further 250-350 thousand square metres would be built on one of the largest...
According to the Minister of Construction, 60-65 hectares would be built and 25 hectares would be developed into a public park. The concept includes the extension of metro line 1 and the construction of a new railway station...
The Szegedi út level crossing, renovated by MÁV FKG, has been opened to road traffic.
During the works, trains will run on the Esztergom, Vác and Veresegyháza lines with modified timetables until the beginning of July.