Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The government wants 10-year development cycles for the construction sector

    • Young skilled workers can set off on their apprenticeship placements today as well

    • It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about

    • „The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

    • Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!

  • Paks II
  • MKIF
  • What is being built?
    • Pécs, Gödöllő and Budapest: four SPAR stores have been refurbished – here’s which ones

    • They could reshape the historic city centre, transport in the suburbs and even a unique public park in Székesfehérvár

    • The time has come: the sports hall in Dunakiliti is to be refurbished

    • It has long gazed down from Kő-hegy; at last, the Hungarians’ totem animal can be restored

    • Work is set to begin on the restoration of the façade of a building designed by a leading Baroque architect in Pápa

  • Climate-X
    • This is a first: green energy is being generated from a depleted hydrocarbon well in Kiskunhalas

    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

  • Bound track
    • The River Charles posed no obstacle either – the M1 bridge is being rebuilt 1 metre higher

    • Preparations for the refurbishment of the main railway line in Pécs are set to begin

    • Plans are already underway for the next phase of the Buda interlinking line, extending it as far as Albertfalva

    • A new public procurement process is being prepared to continue the second phase of the Déli körvasút

    • The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

  • Industry news
    • An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

    • Are you a marketer? Make yourself visible!

    • We do need a pump after all! – How does the BIM pay for itself in industrial investments?

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

  • Magyar Építők

Planting in the Ploughshares

  • What is being built?3 years ago

    The rebirth of the Living Major on the south shore of Lake Balaton

    After three years of renovation work, the Szántódpusztai Majorság was opened in December 2023. During the reconstruction, the vault of the Horse Stables building was reinforced with the Mapei FRCM system...

More Posts
  • Latest
  • Popular
Road building2026. 11. 20.

Roadworks are taking place at 15 locations in Balatonfüred

Road building2026. 11. 20.

SWIETELSKY is inspecting and repairing the surface defects on Main Road 25

What is being built?2026. 11. 20.

Pécs, Gödöllő and Budapest: four SPAR stores have been refurbished – here’s which ones

What is being built?2026. 11. 20.

They could reshape the historic city centre, transport in the suburbs and even a unique public park in Székesfehérvár

Railway development2026. 10. 23.

The Buda interchange could also be extended northwards

What is being built?2026. 10. 22.

Order has been restored: production of the new Közlekedési Múzeum can now go ahead as originally planned

What is being built?2026. 10. 23.

Many people from the capital are also choosing it as their new home: four buildings are being constructed in Gárdony using a special foundation system

Industry news2026. 10. 26.

The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

Advertisement

Building Connections

Building Connections provides a clear, professional overview of the construction industry in Europe, Central Europe and the Balkans. Exclusive information and accurate content.

Follow us

Latest

  • Road building2026. 11. 20.Roadworks are taking place at 15 locations in Balatonfüred
  • Road building2026. 11. 20.SWIETELSKY is inspecting and repairing the surface defects on Main Road 25
  • What is being built?2026. 11. 20.Pécs, Gödöllő and Budapest: four SPAR stores have been refurbished – here’s which ones

Selection

  • Current at2026. 09. 15.An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward
  • What is being built?2026. 10. 20.Reconstruction of the M1 motorway’s carriageway towards Győr can begin under the new traffic arrangements
  • Road building2026. 09. 09.A roundabout with traffic lights could solve the problem at one of Győr’s congested junctions

© 2026 Building Connections - BC Zrt. - 20 November 2026.

  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Cookie Policy
  • Tokajland
  • BC COMM