The government wants 10-year development cycles for the construction sector
Young skilled workers can set off on their apprenticeship placements today as well
It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
Pécs, Gödöllő and Budapest: four SPAR stores have been refurbished – here’s which ones
They could reshape the historic city centre, transport in the suburbs and even a unique public park in Székesfehérvár
The time has come: the sports hall in Dunakiliti is to be refurbished
It has long gazed down from Kő-hegy; at last, the Hungarians’ totem animal can be restored
Work is set to begin on the restoration of the façade of a building designed by a leading Baroque architect in Pápa
This is a first: green energy is being generated from a depleted hydrocarbon well in Kiskunhalas
Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy
A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change
The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill
This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented
The River Charles posed no obstacle either – the M1 bridge is being rebuilt 1 metre higher
Preparations for the refurbishment of the main railway line in Pécs are set to begin
Plans are already underway for the next phase of the Buda interlinking line, extending it as far as Albertfalva
A new public procurement process is being prepared to continue the second phase of the Déli körvasút
The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge
An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics
Are you a marketer? Make yourself visible!
We do need a pump after all! – How does the BIM pay for itself in industrial investments?
The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers
The road construction sector celebrated its half-century anniversary in Eger
This was the biggest development in the Tihany Abbey since the building was built in the Baroque period.