Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The government wants 10-year development cycles for the construction sector

    • Young skilled workers can set off on their apprenticeship placements today as well

    • It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about

    • „The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

    • Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!

  • Paks II
  • MKIF
  • What is being built?
    • Demolition work is in full swing on the side of the M1 motorway heading towards Győr

    • A college of circus arts is being built in Pesterzsébet

    • Gádoros community centre is being modernised through a complete refurbishment

    • The central section of Szeged’s riverfront is to be transformed into a promenade

    • Hungary’s first indoor sports hall is set to undergo a comprehensive refurbishment

  • Climate-X
    • This is a first: green energy is being generated from a depleted hydrocarbon well in Kiskunhalas

    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

  • Bound track
    • Plans are already underway for the next phase of the Buda interlinking line, extending it as far as Albertfalva

    • A new public procurement process is being prepared to continue the second phase of the Déli körvasút

    • The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

  • Industry news
    • An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

    • Are you a marketer? Make yourself visible!

    • We do need a pump after all! – How does the BIM pay for itself in industrial investments?

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

  • Magyar Építők

Újpalota

  • What is being built?3 years ago

    A new supermarket has been built from a former car showroom in an outlying district of the capital

    The SPAR, built with an investment of HUF 1.35 billion, will create new opportunities for the residents of Rákospalota, Pestújhely and Újpalota and for people arriving in the capital.

  • Road building3 years ago

    Busy sections of road near the M3 motorway in Budapest renewed

    The work of Strabag-csoport will make traffic safer in Újpalota.

More Posts
  • Latest
  • Popular
Bound track2026. 11. 16.

Plans are already underway for the next phase of the Buda interlinking line, extending it as far as Albertfalva

Climate-X2026. 11. 16.

This is a first: green energy is being generated from a depleted hydrocarbon well in Kiskunhalas

What is being built?2026. 11. 15.

Demolition work is in full swing on the side of the M1 motorway heading towards Győr

What is being built?2026. 11. 14.

A college of circus arts is being built in Pesterzsébet

Railway development2026. 10. 23.

The Buda interchange could also be extended northwards

What is being built?2026. 10. 21.

We took a look at how the refurbished Igazságügyi palota building turned out

What is being built?2026. 10. 21.

An arena powered exclusively by green energy is set to be built in Romania: construction of the stadium is already underway

Bound track2026. 10. 19.

This time, speed limits are being lifted on the Hatvan–Szolnok line

Advertisement

Building Connections

Building Connections provides a clear, professional overview of the construction industry in Europe, Central Europe and the Balkans. Exclusive information and accurate content.

Follow us

Latest

  • Bound track2026. 11. 16.Plans are already underway for the next phase of the Buda interlinking line, extending it as far as Albertfalva
  • Climate-X2026. 11. 16.This is a first: green energy is being generated from a depleted hydrocarbon well in Kiskunhalas
  • What is being built?2026. 11. 15.Demolition work is in full swing on the side of the M1 motorway heading towards Győr

Selection

  • Engineer of the month2026. 10. 29.From a summer work placement to plant management – Márton Tihanyi has been finding new challenges at the same company for two decades, 1 October TP2349T
  • Current at2026. 09. 09.A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
  • Bound track2026. 09. 24.Major renovation work is set to begin on the Buda section of tram line 6

© 2026 Building Connections - BC Zrt. - 18 November 2026.

  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Cookie Policy
  • Tokajland
  • BC COMM