Road building

Three main roads around Szeged to be widened to four lanes

Published

46 billion forints to develop Szeged Industrial Park.

As reported in the latest issue of Magyar Közlöny (No. 185) : a development project worth approximately HUF 46 billion in state subsidies has been announced in connection with the Szeged Industrial Park. The purpose of the „public infrastructure developments” is almost certainly related to the construction of the Szeged BYD car factory, which has also just been announced. rel="noopener">BYD car factory in Szeged, which has also just been announced.

 

 

On the basis of the two decisions (Government Decision 1595/2023 (XII. 21.) on the support of the public infrastructure development of the Szeged Industrial Park and on the provision of the necessary funds, and Government Decision 1596/2023 (XII. 21.) on the amendment of Government Decision 1200/2023 (V. 17.) on the declaration of land areas outside the County of Szeged as investment target areas), several large-scale developments are expected:

  • widening of the 5 motorway to 2×2 lanes between the M43 motorway and the ELI-ALPS laser research centre roundabout, with parallel cycle lane and street lighting;
  • 2×2 lane extension of road 502 to road 4519 on a new route, with parallel cycle path and footpath, with street lighting;
  • widening of road 4519 into a 2×2-lane main road between the M43 motorway and the Rókusi körút, with a separate level crossing at Tram-Train;
  • upgrading the level crossing of the Vértói út - Tram-Train railway line to a separate level crossing.

In addition, utility improvements and the extension of the electricity network are also included in the decision.

 

Source : Link

Popular