Road building

Baranya town moves forward with road renovation

Published

Illustration
The STRABAG and Soltút modernised the Siklós section of the road.

Using EU funds from Magyar Közút Nzrt. EU TOP Plusz funds, the company has initiated the complete renovation of more than 29 kilometres of secondary roads on 13 road sections in Baranya County. The company is implementing the projects with the help of a gross HUF 8.071 billion non-repayable grant from the European Union under three grant agreements. The state-owned company summarised all this in a press release on the occasion of a press event.

As stated, the listed developments included the renovation of a total of approximately 2.720 kilometres of the road connecting Siklós and Drávaszabolcs, marked as 5712. This project was carried out by Strabag Általános Építő Kft. between 1+777 and 3+542, and by SOLTÚT Kft. between kilometre markers 0+005 and 0+960, with a net investment of HUF 405.24 million, as previously reported here.

As part of the renovation, the specialists also profiled the existing pavement, replaced the entire track structure in the necessary places, then built a levelling layer, followed by an asphalt wearing course and a new floor over the entire surface. The KRESZ signs were replaced and new permanent pavement signs were painted. The roadside drainage system and culverts were upgraded and the bridge on this section was modernised.

Source : Link

Popular