Industry news
New pavement to make traffic safer at this hospital in Békés
The Pándy Kálmán Hospital of the Central Hospital of Békés Vármegyei Central Hospital in Gyula is offering better and safer conditions to its patients thanks to a newly inaugurated development, according to a Duna Aszfalt Zrt. statement. During the works, 850 square metres of pavement at the Semmelweis block, which was previously in poor condition, was renovated. In addition, a new reinforced concrete ramp has been installed to replace an unusable entrance lift, helping to improve access and access to the institution.
The new pavement with stormwater drainage and the reinforced concrete ramp were donated to the hospital by Duna Aszfalt Zrt.. The amount of the grant exceeds HUF 25 million even at cost price.
The reason for the improvement was that the road in front of the hospital building - from the old main entrance on Semmelweis Street to the new surgical block - was very worn and dangerous, with heavy traffic every day. The renovation was therefore timely and the institution was constantly looking for ways to do it.
In addition to health, they also support the world of sport
Dr. József Kovács, Member of Parliament, Dr. László Becsei, Chief Medical Director, Béla Puskás, Regional Director of Duna Aszfalt Zrt. and László Tóth, Chairman of the Board of Directors of Duna Aszfalt Zrt. were present at the handover event on 5 October. Dr. László Becsei stressed that the work carried out by Duna Aszfalt Zrt. has made the access to the building safe. "Ambulances, pushchairs and pedestrians can now approach the building via the unobstructed, renovated road," he added.
In his speech, László Tóth emphasized that charity has always been a priority in the history of the company, which has a history of almost 35 years.
"In the health sector in particular, we tend to support a good cause, whether it's renovation or the purchase of equipment. At the same time, we are also present in the world of sport as a sponsor of several national teams," said the chairman of the board.
He recalled that the company regularly supports Hungarian healthcare institutions, as it did recently when it supported the Bács-Kiskun County Teaching Hospital with a HUF 30 million equipment. Thanks to this support, the Paediatric Cardiology Department and the Pulmonary Medicine Department of the Kecskemét hospital each received a high-value, important piece of equipment.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
