Industry news
A change of mindset can also bring efficiency gains, or the Lean method in focus
On 21 February, a committee comprising numerous construction companies met to establish the ÉVOSZ Lean working group. The professional work initiated by Market Építő Zrt. has no less an aim than to make the Lean approach available to key representatives of the construction industry, thereby strengthening the performance of the entire industry.
The current crisis situation could also be an advantage
As Laszlo Koji, President of ÉVOSZ pointed out in his welcome speech, he believes that the biggest issue in the construction industry today is to improve efficiency, and the first thought is typically to reduce costs. However, there are those who are ahead of the crowd, who are coming up with solutions to improve efficiency and therefore performance, with cost reduction being a result of results, not the solution.
Such is the case of Market Építő Zrt., a leading contractor that aims to introduce the Lean methodology, which has been missing in Hungary - at least in the construction industry. Robert Mikusi, deputy CEO of Market Építő Zrt. and Réka Pap Lean-management expert, suggested that the members of ÉVOSZ should work in a working group to develop a framework for the method, which has been known for 20 years, that can be used in the industry and adapted to Hungarian conditions.
"I am sure that the medium and large companies that are members of ÉVOSZ will survive this difficult 1.5 to 2 years, but it is not all the same how", the President stressed, referring to the current difficult situation of the construction industry.
It can also be a useful crisis if it spurs companies to compete more effectively, think together and improve efficiency, and even use this difficult period to their advantage. It is no coincidence that the call has attracted volunteers from many parts of the value chain to set up a working group to promote Lean in the domestic construction industry, as today a company cannot be efficient on its own.
Knowledge sharing must come to the fore
"It's an old tradition to berate the competition and defend everything you have (knowledge or even a network of contacts). We need a change of mindset in this respect, because only through joint ventures and knowledge sharing can a company get ahead today" - underlined the Deputy CEO of Market Enterprise.
"Large companies have a duty to pull small and medium-sized enterprises along with them, which is why we are committed to Lean", emphasized Róbert Mikusi, adding that we are happy to lead the working group and welcome anyone to join us. And since the Lean approach is different for manufacturers than for general construction, it is particularly useful to have companies from as many different backgrounds as possible represented in the group.
Réka Pap, management expert at Market Építő Zrt. Lean (with whom we recently spoke at a major interview on the subject) has also been working on Lean adaptation for almost three years, which came into the Market's field of vision based on customer expectations. The company's senior management decided that they needed to learn about the methodology and figure out how to apply and integrate it into their practices.
As a result, they concluded that a new approach to project management systems and a new way of thinking is needed, with digitisation and data analysis as important tools for sustainability. The methodology is all about increasing efficiency and centralising customer value by embedding Lean in everyday life.
"It is important that all participants use it, it is not a one-actor thing"- emphasized Réka Pap.
Last year, Market experts made two study visits to the USA, where they learned about the methodology from several angles and attended a conference. Lean is now very important in the US construction industry, but it is also becoming increasingly important in Europe - Germany in particular is pushing for its widespread adoption.
Already tested at home
In addition to establishing international relations, pilot projects were also launched, among which the operation of the reinforced concrete prefabrication plant of PREbeton (a subsidiary of Market – ed.) reinforced concrete prefabrication plant, where they are specifically trying to organise production on the basis of Lean.
"We need to create a standard based on the scientific part of the Lean methodology, according to which it can be used uniformly in the construction industry in Hungary; then we need to continuously examine the results we have achieved" - summarized the goals of Réka Pap, who is also a doctoral student at the University of Debrecen, dealing with the professional background of the topic.
Common knowledge is needed
Several speeches at the founding meeting highlighted the scale and importance of the work. Amongst others, the need to establish a common dictionary for use in the home country was raised, in order to ensure that everyone has a common understanding of the concepts involved. At present, there is hardly any literature available in Hungarian on the subject, so the working group could play an important role in compiling a specialised Hungarian-language dictionary. Related to this, training in this area is still almost unavailable in the construction industry and should be developed.
"After defining the common language," said Réka Pap, "we need to communicate the philosophy to all employees, because the essence of Lean is to put people first. The aim is for everyone to know exactly what they are doing and to see how they can do their job as efficiently as possible, thus ultimately helping the whole value chain to function."
A significant result would be if the working group's operation could also allow for the creation of Lean-based, collaborative contract templates and integrated project implementation contracts. At least as useful could be the introduction of project preparation with all participants, using the example of the US, where all data is shared - even profits. This would also help the domestic construction industry to move in a direction where selection is not based on numbers but on knowledge and performance.
The following companies volunteered to participate in the working group in the first round
- Barabás Téglakő Kft.
- ÉVOSZ
- FLOW Hungary
- Mercor Dunamenti Zrt.
- Grabarics Kft.
- Hídépítő Zrt.
- Inconex Kft.
- KÉSZ Építő Zrt.
- Layher Kft.
- Market Építő Zrt.
- Masterplast Hungária Kft.
- Moratus Szerkezetépítő Kft.
- Peri Kft.
- STRABAG Építőipari Zrt.
- Szabadics Zrt.
- Knowledge Building Team Nonprofit Zrt.
- Weinberg ’93 Kft.
- WHB Group - TSPC Csoport
There will continue to be opportunities for new companies to join the Open Working Group, creating the right platform for thinking together.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
