Industry news

Dynamic spaces, shades of blue - the Weinberg can be Office of the Year

Published

Tamás Dernovics | magyarepitok.hu
A public vote will also decide the winner of the competition.

The Office of the Year competition and Real Estate Awards, which now rank among the most influential events in the property market, have a 15-year history. The competition awards offices, office buildings, community spaces, companies, and planned or completed projects. Those who moved or renovated in 2024 and are proud to show themselves to the general public were eligible to apply.

Anyone can now vote for their favourite office until 3 February on the competition website. The readers' opinions count, as they will be included in the final result with a weighting of 10%, which means they could even change the jury's decision.

Office building worthy of its market position

Among the entrants is Weinberg "93 Építő Kft., one of Hungary's leading general contractors and steel structure manufacturers. Due to the large increase in staff numbers, new office building at its headquarters in Sárospatak, which does not compete with the previous office building, but instead reflects the spirit of the company and is connected to it by a bridge.

The profile of the Weinberg has resulted in the use of a lot of steel and glass, complemented by a number of elements that make the interior more welcoming from a visual, tactile and acoustic point of view.

The company's conscious effort is to foster a sense of family and human contact, and the new office building reflects this spirit, with lobbies, meeting spaces, spacious terraces and community areas.

The result: a flexible and modern open office with highly automated engineering, delivered on budget and on time, as part of a project that won international attention.

The new office building, designed by BuildEXT Kft., has a floor area of 1,100 square metres, with a total of 1,700 square metres of office space connected to the old building. Here, BuildEXT was not only responsible for the design, but also for the project management of the BIM-based project, which was given special attention. By placing the BIM model in a simulation environment, the energy use of the building was optimised, thus reducing operational carbon emissions, which are of key importance from an ESG perspective.

Flexible and modern office

The new office consists of two parts: a three-storey building with a pillar frame and a neck section, which connects the offices of the main building with a bridge structure to create a functional unity between the old and the new facility. The internal office spaces are designed with flexible, state-of-the-art solutions to ensure optimal occupancy and employee satisfaction in the long term. The canteen, for example, can be connected to the two adjacent meeting rooms by mobile walls, making it a community room for small company events. The open office space is broken up by chatboxes for short meetings, and staff comfort is further enhanced by highly automated lighting and engineering.

On 25 April 2024, Weinberg celebrated its 30th anniversary in Sárospatak with the inauguration of its new office building. as part of a large-scale event, which was also reported by our newspaper. You can vote for the office building via THIS LINK.

Source : Link

Popular