Industry news
Visitors welcome winter and summer in the second indoor garden show gallery of Leier
After several years of mutual satisfaction between builders and Leier have been operating to their mutual satisfaction for several years, the first Kaiserstein Gallery has been opened in Jánosháza by Leier Hungária Kft., which plays a key role in Hungary's construction materials market, has decided to open a sister gallery in Jánosháza. The new covered structure replaces a former open-air show garden.
Located on the border of Vas and Veszprém and Zala counties, the settlement brings the company's products closer to the people building in these areas (or even further away). In an aesthetic setting and layout, the full Kaiserstein range is now also on display next to the Leier factory in Jánosháza (located at the junction of the 8 and 84 main roads, next to the roundabout).
The demonstration garden will be open from 1 April 2025, from 7:00 am to 7:00 pm on weekdays.
We got information about the newly opened gallery from Andor Komlós, the manager of Leier Hungária. We learned that the company began construction of the new showroom at the end of 2024, and it took the whole winter to build it.
From paving to fence stones
Just as in the first Kaiserstein Gallery in Győr, Jánosháza can be viewed with layouts that reflect real-life situations, demonstrating both the harmony of colour and the advantages of spatial arrangement.
- the popular tiles (they are recommended for patios and barbecue areas),
- as well as paving stones designed for pavements and garage driveways, which can be safely loaded by car.
- It also has a number of garden ornamental elements,
- with staircase and
- fence stones were also used to create installations in the new gallery.
The manager pointed out: in the model garden, the paving products can be seen in the physical reality, their colour and shape can be checked. The product photos in the catalogue or on the website do not always reflect the real colour and texture of the paving, which is why a visit to the site can help in the decision.
The more people who come, the more visitors are welcome
The manager reminded that Leier has been operating its indoor demonstration garden in Győr for the fourth year, where many people have visited not only from the surrounding area, but also from more than 100 kilometres away, to see the selected paving or fence stone in action. The new model garden in Jánosháza will enable the company to cover an even wider area.
As the Kaiserstein gallery is located in the office building Leier in Győr, visitors can be met and advised in person. The Jánosháza counterpart is open to the public, but they cannot guarantee a permanent personal presence, Andor Komlós pointed out in the spirit of full openness. We have a nationwide sales coverage and the gallery is no exception", he added.
From housing to municipal projects
The manager also said that they serve both residential and commercial projects, as well as municipal projects: "our model gardens are visited by representatives of all market segments", he stressed. Finally, he ended his presentation with an invitation "We hope to welcome more visitors in the future: we are very happy to welcome all those who are building or about to build. But a garden like this can be a lasting aesthetic experience for practically anyone who is receptive. Come and visit us in Győr or Jánosháza!"
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
