What is being built?
One of the highlights of Hungarian reinforced concrete architecture will soon be open to the public again
The covered observation deck on a 72-metre-high monolithic reinforced concrete column with cantilevered support and the panoramic café above, with its twin staircases leading up to it, are of exceptionally harmonious proportions, clearly identifiable from anywhere in the city and a true symbol. Designed by Miklós Hofer and György Vörös, the 1963 tower complex is not only a symbol of Miskolc, but also an internationally significant achievement of Hungarian late modern architecture.
The video can be viewed on Facebook by clicking here.
József Viszlai, Ybl Miklós Prize-winning architect, former chief architect of the city of Miskolc, and Épkar Zrt. will be responsible for the construction, one of the most memorable works of Hungarian modernism will be renovated. During the investment, the building will be structurally reinforced, the entire building services will be replaced, antennas will be removed from the building, the floor covering will be replaced, the walls will be repaired and the stairs will also be reinforced. The café in the lookout tower will also be renovated in terms of infrastructure and energy efficiency. As contemporary elements, the column will be given a clean, homogeneous covering, while the café will be fitted with floor-to-ceiling windows and unique lighting, and the ground floor open space will be made suitable for outdoor performances, music events and receptions.
Despite the changing weather, the structural construction of the hospitality building is progressing spectacularly both inside and out, according to a post on the Épkar Facebook page.
The complex programme will also include the creation of a promenade in the area below, the renewal of the Győri Nagy Lajos staircase and Toronyalja Street, and the replacement of the paving, street furniture and chandeliers around the building. The observation tower Avasi will soon be open again for visitors to relax and enjoy the scenery.
Source : Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
-
Current at 2026. 10. 13.
It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about
