What is being built?
The famous monument of Badacsony opens to guests once again - PHOTOS
The renovation of the Tátika restaurant in Badacsonytomaj, a building recognised as a historical monument in 2011, has been completed. The cultural monument, located in the immediate vicinity of the town's harbour, was renovated by EB Hungary Invest Kft.. The company announced the completion of the project on Facebook in a post titled post. According to data from the Public Procurement Bulletin, the EBH Invest is for the reconstruction of the building, while Everling Városépítő Kft. was contracted by BTTF Badacsony és térsége Turisztikai Fejlesztő Nzrt. for the environmental renewal with BTTF Badacsony és térsége Turisztikai Fejlesztő Nzrt..
The building, designed by Ferenc Callmeyer, originally stood directly on the waterfront with its cantilever above the water, but it could not withstand the regular winter icing, so the area in front of it was filled in and is now a terrace. The Tátika was also rebuilt in the 1980s, again to the design of Ferenc Callmeyer.
There will be a restaurant in Tátika again
While the monument, which was inaugurated in 1962, still looks like it did when it was built, the renovation has also added new features, according to the contractor's Facebook post, adding that the plans are to create an information office and a community space for tourists on the lower level, and to continue to operate as a restaurant on the upper level.
The project will include
- Mechanical installation works (heat pump heating system, water and sewage network, heating);
- and electrical installation work for high and low voltage (security systems, computer systems, lightning protection)
- and lift construction on a total area of more than 1,000 square metres.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
