What is being built?

The imposing main building of the University of Debrecen will soon be reborn

Published

The façade will be renovated in six phases over a period of just over two years, and some of the pavements will be replaced.

The historic, listed main building of the University of Debrecen is undergoing a complete technical and aesthetic renovation of its façade. The call for tenders for the construction work has been published in the European Public Procurement Bulletin (TED) here. As stated, the institution's goal is to restore the university's central building to its former glory with the reconstruction, as it will celebrate its 100th anniversary in 2032.

The project will be implemented in six phases, with each phase taking five months to complete and the last six months, so the development will be completed in just over two years. The total surface area involved is 15,742.54 square metres.

The planned renovation works include the cleaning of the plastered and stone facade surfaces, replacement where necessary (missing cornice elements, members), washing of the rainwater drainage system, replacement of the gutters where necessary. Repair and possibly replace tin roofing. Exterior windows will be repaired and interior sashes will be replaced with new insulated glazing.

Source: unideb.hu

The pavements around the building will also be renovated. Those that are not original will be demolished and replaced by new pavements with a washed gravel surface.

The main building of the university was inaugurated in 1932, and its construction, which began in 1927, was met with great interest. The imposing eclectic-neo-baroque main building has a glass-roofed courtyard with an arcaded corridor system, the walls of which are inscribed with the names of the most famous professors and students. In front of the building there is a spacious French-style park, where each graduating student traditionally takes a dip in the fountain. The statues on either side of the park commemorate the personalities of the Reformation in Debrecen," says the debrecen.hu.

Source : Link

Popular