What is being built?

The renewed building of the ELTE ÁJK in Kecskeméti Street has been modernised in terms of energy

Published

More than 1,600 square metres of the Eötvös Loránd University's Faculty of Law and Political Sciences in Kecskemét Street have been renovated.

The infrastructure development of Eötvös Loránd University, which has been ongoing since 2022, has reached another milestone. This time, the facade of the Faculty of Law and Political Sciences' building complex on Kecskeméti Street was renovated, and energy renovation was also carried out. The investment was implemented with the support of the Hungarian State and the European Union in the framework of the project KEHOP-5.2.2-16-2017-00112, implemented by Best Solution Konstrukt Kft..

The renovated building was already occupied by ELTE students and teachers in mid-February, and the inauguration ceremony was held on 18 March 2024 with the participation of Minister of Public Administration and Regional Development Tibor Navracsics and the leaders of the university.

 

Reconstruction under heritage control

The façade of the building on Kecskeméti Street was completely renovated, including the wing at 31-33 Magyar Street, built in 1797 and protected as a historical monument. The works included the stone-clad and plastered part of the building, the renewal of the public and inner courtyard façade of the Magyar utca wing and the smaller building in the inner courtyard.

 

 

On the Kecskeméti Street side, 900 square metres of tiles were replaced with limestone from Süttői, and at the same time thermal insulation was carried out. The Magyar Street wing was also insulated against ground moisture. The entire reconstruction was carried out under close heritage protection control by ELTE's Directorate General of Technology.

At the handover ceremony on 18 March, Tibor Navracsics, Minister of Public Administration and Regional Development, said in his welcome speech that as a lecturer at the Faculty, he is personally very pleased that students can now study in more dignified conditions. "Higher education is a long-term investment, the payback period of which will only unfold in future generations. There is now fierce competition between higher education institutions around the world. ELTE is a world-renowned university that represents our country on the world stage in academia. In order to compete, we need continuous improvement, and the modernisation that has just been completed is an important step in this process."

The Kecskeméti Street facility has been fully operational since the beginning of the spring semester.From 15 January 2024, the Office of Studies and the International Office will resume their work in the same building, in the same premises.

 

Source : Link

Popular