What is being built?
The apartment hotel in the capital of Lake Balaton will soon be ready for construction
Construction of the Sió Residence apartment hotel in Siófok is proceeding according to plan – as reported by social media page of Dryvit Profi Kft. According to a report from the Debrecen-based construction company, work is currently underway on concreting the slab above the first floor, and the building will soon be structurally complete.
According to the Hungarian company's website, the three-storey apartment hotel being built on the banks of the Sió is characterised by its green surroundings and clean, modern interiors. The atrium-style building with a central corridor will have two wings. The wings will house living spaces, while the two wings will accommodate rooms and other ancillary functions.
The hostel, which will open at the end of the year, will have 40 apartments with a green roof on the top floor. Each apartment will have its own bathroom, entrance hall and terrace, with a kitchen-dining room, laundry room, lounge and reception area on each floor.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
