What is being built?

More than 700 metres of symbolic suspension bridge opened in Sátoraljaújhely

Published

The bridge is supported by six steel cables at a height of 80 metres and successfully passed the dynamic and static load tests in April.

The Bridge of National Unity was inaugurated on 4 June in Sátoraljaújhely. In his brief report on the more than 720-metre-long structure, Tamás Varga, managing director of the Graboplan-Industrie Kft. contractor, said that the bridge had sunk 1.2 metres under the weight of 300 people during load tests, and that there would be a height difference of 2 metres between the winter and summer conditions.

As previously reported by napi.hu reported, the record-breaking bridge is held up by six steel cables at a height of 80 metres and successfully passed dynamic and static load tests in April.

 

 

A symbol of togetherness

At the inauguration ceremony of the record-length suspension bridge, Deputy Prime Minister Zsolt Semjén commemorated the anniversary of the construction of the structure. The Trianon peace dictate is "an eternal wound, a Hungarian stigma and a mission of survival", said Zsolt Semjén, who said that national unity has three meanings, which nevertheless give it a unity: mourning, learning lessons and national pride that the Hungarian nation has survived.

 

 

He stressed:

The Bridge of National Unity, inaugurated on Tuesday, is itself a "symbol of unity". The building is not only a work of engineering, but also a symbol that connects Hungarian with Hungarian, remembrance with hope, mourning with pride, and the calvary of Trianon with the Hungarian resurrection.

Source : Link

Popular