What is being built?

A modern education centre is built from a former hotel in the centre of Győr

Published

tourism.com
The former hotel, which has been operated by MCC for three years, is undergoing a complete refurbishment of its building services, electrical and architectural installations.

REAG Invest Kft. will carry out the refurbishment of the Mathias Corvinus Collegium educational centre in Győr city centre, according to the tender published on TED. The contract, worth HUF 2.058 billion net, is for the conversion and renovation of the former hotel building at 3 Apor Vilmos Bishop Square.

Work to be carried out in the vicinity of historic buildings

The announcement also reveals that the project will take place in the heritage-protected area of Győr's city centre, the Káptalandomb National Monument. It is also a reference to the fact that the building, formerly known as Konferencia Hotel, is located next to the Cathedral of the Assumption of Our Lady and the Bishop's Castle.

The description stresses that the purpose and use of the building complex will not change. The works will involve a complete mechanical, electrical and architectural renovation of 65 per cent of the building - but the renewed system will serve the whole building.

Allow for future renovation and change of function

It is important to note that all this work is taking place while the education centre is open. It is also described that the planned works do not include the renovation of the indoor units and the swimming pool area, nor do they include the construction of the attic.

At the same time, the present design should allow for future renovation and change of function in terms of building services and electrical installations: only by means of building services and electrical extensions, without demolishing the existing systems.

The development of the centres is also a way to save value

The Győr Konferencia Hotel was built in 1978 for Rába Magyar Vagon- és Gépgyár. Previously owned by Győr-based Rába Járműipari Holding Nyrt., it was purchased by MCC in 2021. According to reports at the time, the full vertical of MCC's training programme was then launched in the building, which also provides a residential dormitory for junior trainees.

Speaking at the 2021 press conference to announce the transaction, Balázs Orbán, the Prime Minister's Political Director, said:

In every city where MCC is present, they are looking for a building and a centre that is both a symbolic space for the city and in need of renewal and rescue in some way. This is how Konferencia Hotel was chosen and bought at auction. It was already indicated at the time that they wanted to renovate the building.

Source : Link

Popular