What is being built?

Ganz Ábrahám Technikum in Zalaegerszeg is enriched with a high-tech workshop

Published

Sight plans: ganztanmuhely.hu
The new workshop will not only provide quality practical training for students at the technical school, but will also contribute to raising the quality of vocational training in the area.

The Zalaegerszeg Vocational Training Centre Ganz Ábrahám Technical College is getting a new vehicle and machinery workshop. According to information from the Electronic Public Procurement System, the work, worth a net value of HUF 762,108,623, will be carried out by BMT Mérnöki Zrt..

The winning bidder will be responsible for the construction of a factory building, internal roads and parking areas, paved and landscaped surfaces and utility connections.

The steel-framed building will house welding, cutting and vehicle workshops, service and social rooms, as well as infrastructure. On the north and south sides, it will have sloping columns. The ground-floor building has a total useful floor area of 683.6 m2.

Sight plans: ganztanmuhely.hu

Main tasks:

  • 9 car parking spaces and
  • Construction of 4 bicycle storage facilities;
  • the construction of a road to provide access to the car parks and to the building;
  • replacement of water reservoir, water mains and power cables;
  • installation of 100 solar panels on the south roof (41.00 kWp).

Development opens up new horizons in vocational training

The SzC Ganz Ábrahám Technikum in Zalaegerszeg is one of the largest vocational training institutions in Western Transdanubia. Students can study engineering, IT and telecommunications, law enforcement and public service, transport and transportation, specialised machinery and vehicle manufacturing, electronics and electrical engineering, and defence.

The workshop aims to make practical training and preparation for the labour market more effective. In the new building, students will develop their skills through state-of-the-art technologies.

The construction of the workshop is part of a comprehensive 1.727 billion HUF project, which will also include the purchase of equipment.

The new workshop will thus provide the highest quality vocational training for young people applying to the technical school in the coming years.

Source : Link

Popular