What is being built?
Debrecen's latest residential development at a turning point
In the spring of 2025, Bayer Construct's machines began the deep construction work, and today, all six buildings of the complex have reached their highest point. In the southern part of Debrecen, the investor Bayer Property, the Bayer Construct Zrt., is responding to the growing demand for housing in one of the country's most important economic centres with the construction of the Epres Liget residential development.
Former barracks area becomes a pleasant living space
The Epreskert district of Debrecen is a residential area, and the buildings are being constructed with lower density in line with this. Two- to four-storey houses are being built on the trapezoidal plot, with particular attention paid to ensuring that the areas close to the family houses are lower. This creates a visual transition to the larger blocks.
The same goal is served by creating smaller units instead of large blocks in order to reduce the density of development. Emphasis is also placed on the garden surrounding the house, which is intended to support the daily lives of those who move here.
549 flats are being built
The secure, easily accessible residential complex will consist of 12 separate buildings, each with a practical balcony (1.5-1.8 metres deep).
These can be accessed from every flat via large, glazed, double-winged patio doors. The heating requirements of the flats will be met by a district heating system, ensuring a long-term, problem-free energy supply for all 549 flats.
Their work to date was recognised with a bouquet of flowers.
As András Varga, head of the Bayer Construct structural engineering division, said at the topping-out ceremony: „The topping-out ceremony is always a special occasion in the history of a building's construction. It is an important milestone: not only a tradition, but also a symbolic moment. It is a recognition that the work done so far rests on solid foundations, both literally and figuratively. The topping-out ceremony is a centuries-old tradition in the construction industry. The green branch or wreath placed at the highest point symbolises life, renewal and hope; it is also a tribute to those who, with their manual labour, knowledge and dedication, have contributed to the construction of the building."
Construction is a unique profession: you have to deal with weather, deadlines, technical challenges and unexpected situations on a daily basis. The fact that we are standing here today is proof that we have found solutions to these challenges together. Perhaps the best part of construction is knowing that our work creates long-term value.”
The price also depends on the technology
Since Bayer manufactures the vast majority of the building materials used, and as a technological innovation, the flats are built with prefabricated bathrooms, construction is particularly efficient.
Interested parties can choose from properties ranging from one-room flats to large flats with a living room and three bedrooms, which are available from one million forints per square metre, so the latest development in this garden city, easily accessible from both the city centre and the railway station, is expected to fill up quickly.
Source: Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage