What is being built?
The University of Miskolc’s new apartments are being converted from an office block
Set within the parkland surroundings of the University of Miskolc campus, this stone-clad office building—connected to the Health Centre by a wing—features ribbon windows. The local company PEKA BAU 2000 Kft. can convert into a 27-flat apartment block.
Total transformation
Eight months and approximately 900 million forints will be made available to the winner of the public procurement to carry out the conversion of the building at 7 Egyetem út. In this project, the current offices will be replaced by 27 flats and 29 bathrooms, covering a total net floor area of 1,455 m2.
The 1,631 m² stone cladding will be replaced with a plastered structure featuring 15 cm of thermal insulation; on the flat roof, slip-resistant rock wool insulation will be installed beneath the waterproofing layers; and all 73 of the old windows and doors will be replaced. The refurbishment will also be evident in the replacement of the interior doors.
The heating system will be supplied by three wall-mounted condensing gas boilers located in the basement, each with a capacity of 40 kW, which will provide heating for the heating network and the indirectly heated hot water tanks. The power supply will also be supported by a solar panel system with a nominal output of 50 kW. The 102 high-performance solar panel modules are controlled by a central inverter.
Accommodation with facilities
The apartments will be fitted with recessed light fittings and wall lamps, and each will feature fitted kitchen units. These will be complemented by 29 kitchen units, 34 built-in wardrobes, 33 bed frames and 17 bedside tables.
A full range of appliances makes the accommodation feel like home: a washing machine, a built-in oven, a built-in microwave and a fridge-freezer will be waiting for guests staying here.
Source: Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
