The Tomori Paul Bridge between Kalocsa and Paks was inaugurated in June 2024, 946 metres long and a 3.5-year construction project...
In the Duna Aszfalt Zrt. main project, the date is fast approaching when the entire bridge can be crossed on foot.
The Kalocsa branch of the bridge is close to closure.
The plans were ready by the end of last year, and now construction can begin: the roughly 28 km link between the 51 motorway and the M6 motorway is part of the...