About 7.1 km of cycle paths are planned between Mindszent and Szegvár.
The 60-year-old, 50-metre-high water tower was no longer stable.
The Magyar Közút investment modernised the 4.4 km section of the 4521 Szentes-Mindszent-Hódmezővásárhely link.