Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Engineering precision is a core value

    • Another major construction project has been launched as part of the Paks expansion

    • Paks II: A spectacular video of the construction of Unit 5

    • This is how the iconic angel on Heroes’ Square is being restored – the restoration has reached a milestone

    • Don’t miss it! The ÉVOSZ Market Telecommunications Conference is back

  • Paks II
  • MKIF
  • What is being built?
    • A new, modern service area is being built on the M4 motorway near Monor

    • The development of the residential complex being built beside Lake Kána has reached an important milestone

    • Flex

      The new Flex factory in Zalaegerszeg demonstrates the strength of group-wide implementation

    • Flextronics is expanding its capacity in Zalaegerszeg with a new logistics centre

    • A helicopter hangar has been opened in Szolnok

  • Climate-X
    • Concrete is not the antithesis of green solutions – Rainwater management in the age of climate change

    • Energy from deep underground: geothermal project gets underway in Mezőcsát

    • An Association of Energy Communities has been established in Hungary – a new era may be dawning for local energy production

    • A 100-metre road was built near Tata from 100 tonnes of waste

    • We can build on Europe's best assets – new sources for geothermal investments

  • Bound track
    • The unique solutions offered by the MEVA are supporting the work on one of the country’s largest railway projects

    • Plans are in place to stabilise the embankment along a critical section of the Lake Balaton railway line

    • Several railway bridges and sections of track are being renovated in the north-east of the country

    • Bridge installation, structural work, tree planting: the Southern Circular Railway had a spectacular February

    • The winner has been selected for the implementation of Phase II of the Buda tram network interconnection project

  • Industry news
    • Self-criticism? Collaboration? Knowledge? What is missing from the Hungarian construction industry? Powerful insights from the head of Weinberg at the Portfolio conference

    • The trend has reversed: the shortage of skilled workers in the construction industry has increased once again

    • Serving the community and culture both inside and out – A commemorative plaque was unveiled at the award-winning Szekszárd Knowledge Centre

    • Three leaders, three perspectives, one direction – Key takeaways from SZABADICS at the Portfolio Construction Industry Conference

    • "This situation can no longer be handled alone!" – the most pressing issues facing the construction industry were discussed at the Portfolio Conference

  • Magyar Építők

Rundflex shutter system

  • What is being built?2 years ago

    Curved formwork technology also proven in an amoeba-shaped building

    The amorphous catering and business pavilion in Balatonfüred, with a ceiling height of over four metres and curved wall forms, was built with the help of PERI formwork and scaffolding systems.

More Posts
  • Latest
  • Popular
Road building2026. 03. 27.

Roadworks have begun this year on the MKIF network

What is being built?2026. 03. 27.

A new, modern service area is being built on the M4 motorway near Monor

Energy2026. 03. 27.

Roszatom is building new nuclear power stations in two Asian countries

What is being built?2026. 03. 27.

The development of the residential complex being built beside Lake Kána has reached an important milestone

Road building2026. 03. 10.

How M1 will change in the coming years – 40 minutes on the past, present and future of M1

What is being built?2026. 03. 27.

A new, modern service area is being built on the M4 motorway near Monor

Bound track2026. 03. 07.

Demolition of embankment begins on closed section of Ajka-Veszprém railway line

Current at2026. 03. 07.

Péter Szijjártó: Bayer Construct has become Europe's leading construction conglomerate

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt.