Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Pécs’s lake is being filled in – the second phase of the Karolina mine’s reclamation continues

    • The Duna Group has been rolled out to large regional companies

    • Take a tour of the Paks expansion: a virtual walk through the nuclear power station’s construction pit

    • Even after a record year, the Szabadics Ride shows no signs of slowing down, with every company reaching new heights

    • One in four: the ruined church in Lajosmizse has been saved

  • Paks II
  • MKIF
  • What is being built?
    • Debrecen could get a southern city centre

    • Social housing and a renovated community centre are being built in Nagyecsed

    • A visitor centre is being built to boost the appeal of one of the Tisza’s largest backwaters

    • The regeneration of Haller Park continues with the construction of a state-of-the-art sports ground

    • The town centre is being transformed – a major development project has begun in Gyál

  • Climate-X
    • Flood retention basin to be expanded – Orosháza is also preparing to manage flash floods

    • Four wind turbines may be built in Fejér County

    • Budapest’s largest solar park has been built on a rooftop

    • Every day, Hungary’s natural land area shrinks by the size of a large factory

    • The area around Malom Lake, one of Oroszlány’s proudest landmarks, is being revitalised

  • Bound track
    • A Hungarian specialist in railway turnouts has won the MÁV billion-forint contract

    • The steel structure of a railway bridge in Budapest, which is nearly 80 years old, has been removed

    • Slow signals are to be phased out on the Veresegyház railway line

    • Funding secured, construction can begin – Tram line extension from Szent Gellért Square to Budafoki út

    • It’s not just a cable car – it’s evolving too – The Zugliget Cable Car is being modernised

  • Industry news
    • STRABAG has acquired a bridge and utilities construction company in Romania

    • More and more companies are realising that, these days, there can be no real success without integrated operations

    • The new press officer for the Ministry of Transport and Investment has been appointed

    • An invisible bond – special bonding technology helped in the construction of the central towers of the Sagrada Família

    • Attila Kerékgyártó has been appointed chairman of the board of Duna Aszfalt

  • Magyar Építők

SMA Binder asphalt mix

  • Road building2 years ago

    Trials on the 1 motorway - Asphalt mixtures proven in Germany and new in Hungary are tested to increase road life

    Using an asphalt mixture of a composition not yet used in Hungary, a wearing course and a binder course with a high density bitumen that differs from the Hungarian standards were developed on the Magyar Közút Nonprofit...

More Posts
  • Latest
  • Popular
Bound track2026. 07. 09.

A Hungarian specialist in railway turnouts has won the MÁV billion-forint contract

Water management2026. 07. 09.

The new water treatment system at Koppánymonostor will improve the water supply to Ács and the surrounding area

What is being built?2026. 07. 08.

Debrecen could get a southern city centre

Road building2026. 07. 08.

The ground beneath the M1 motorway is being reinforced using piles of varying diameters depending on the soil layer

Current at2026. 06. 23.

Major maintenance work on the M7 motorway was completed ahead of the summer peak period

Industry news2026. 06. 23.

Building in harmony with the environment – a Construction Industry Excellence Award plaque was unveiled on the Danube

Bound track2026. 06. 23.

The GYSEV’s new IC trains, which are over a hundred metres long, will be maintained at this workshop

Property2026. 06. 23.

When will it become a trend? Rental flats are being built from a derelict school in Újpest

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt.