We are not a tunnel-building nation, so the M85 tunnel pair project was a huge challenge not only for the contractor, but for all those involved in the project. The pioneering...
We've been following the construction of the M85 tunnel, which has been a highly challenging project, and we'll be presenting a short retrospective at the inauguration.
One of the most exciting Hungarian road projects of the year, the Vienna-Domb tunnel on the final section of the M85 motorway, is expected to be opened at the end of the year. During the construction of the tunnel, experts...
Four nursery schools will be set up in Hillebrand Street to provide the best possible conditions for children in Sopron.
On the Sopron-Agfalva railway line, Győr-Sopron-Ebenfurti Vasút Zrt. (GYSEV Zrt.) has launched a public procurement for the partial reconstruction of two 10.70 m reinforced concrete bridges with circular steel reinforcement.
Before the 780-metre tunnel is opened and put into service, the operator MKIF is carrying out a test run lasting several months: one of the most spectacular elements of this is now being reported.
After the completion of the technical hand-over, many months of work are still needed to put the tunnel pair near Sopron into operation. With the help of the contractor, we learned about the exciting period of trial operation.
Not only is WEST HUNGÁRIA BAU Kft. an indispensable player in major industrial projects, it also plays its part in the country's most important educational developments.
The bypass 8647 was built as a dual carriageway of about 4 kilometres by Dömper, Subterra-Raab and Pannon-Doprastav.
The Sopron swimming pool, built by the consortium of WHB and FÉSZ, now has a signboard announcing the successful completion of the construction project in all aspects.